Laserfiche WebLink
<br />I <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />--i <br />) <br />) <br />) <br />!' J <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />I <br /> <br /> <br /> <br />-1- <br /> <br /> <br />Indication of How Long It Would Take to Implement Service After Authorized <br />to Begin: <br /> <br />The CGA Team, consisting of Calvin, Giordano & Associates, Inc, (CGA) and sub-consultant Langan <br />Engineering & Environmental Services can begin work on the project the day of receiving the Notice to <br />Proceed from the City of Sunny Isles Beach. The engineering staff assigned to this project has the capacity <br />to begin immediately working on the project gathering as-builts and permits. Our survey department staff <br />can place a crew in the field within 48 hours of receiving the Notice to Proceed to begin the design survey. <br />-From that point, alloHier services woula-Collow uninterrupteCl: Ba-sed on our experiencewith these types <br />of projects and more specifically our permitting experience with DERM and FDEP on these types of <br />projects, CGA would expect that our team would have an advantage with shorter length of time permitting <br />and fewer RAIs than most other firms. <br /> <br />RFQ #11-11-02, Civil Engineering Services to Design Street and Drainage Improvements <br /> <br />Page 115 <br />