My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 2:12:13 PM
Creation date
2/9/2012 2:09:32 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />--i <br />) <br />) <br />) <br />!' J <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br />I <br /> <br /> <br /> <br />-1- <br /> <br /> <br />Indication of How Long It Would Take to Implement Service After Authorized <br />to Begin: <br /> <br />The CGA Team, consisting of Calvin, Giordano & Associates, Inc, (CGA) and sub-consultant Langan <br />Engineering & Environmental Services can begin work on the project the day of receiving the Notice to <br />Proceed from the City of Sunny Isles Beach. The engineering staff assigned to this project has the capacity <br />to begin immediately working on the project gathering as-builts and permits. Our survey department staff <br />can place a crew in the field within 48 hours of receiving the Notice to Proceed to begin the design survey. <br />-From that point, alloHier services woula-Collow uninterrupteCl: Ba-sed on our experiencewith these types <br />of projects and more specifically our permitting experience with DERM and FDEP on these types of <br />projects, CGA would expect that our team would have an advantage with shorter length of time permitting <br />and fewer RAIs than most other firms. <br /> <br />RFQ #11-11-02, Civil Engineering Services to Design Street and Drainage Improvements <br /> <br />Page 115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.