My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jorge A. Gutierrez Architect LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-01-03 Dev. plans and Survey for Temp Trailer
>
Responses
>
Jorge A. Gutierrez Architect LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 9:06:00 PM
Creation date
2/15/2012 11:23:24 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Dev. Plans and survey for Temp Trailer
Bid No. (xx-xx-xx)
12-01-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIIS - PROJECT EVALUATION Saturday, February 19, 2011 - 2:21:46 PM <br />24 <br />MIAMI -DADE COUNTY, FLORIDA <br />MIAMMADE Capital Improvements Information System <br />Miami -Dade Water and Sewer Department <br />Contractor / Consultant Evaluation <br />EDP Project: EDP -WS -S -148 Evaluation Type: Standard Evaluation <br />Title: WATER TRANSMISSION SYSTEM COMPUTER MODEL <br />Contractor: ROSS ENGINEERING, INC. FEIN: 450500482 <br />Department Contact: Patty David 7865528040 Award Amount: $0.00 <br />Page 1 of 2 <br />Evaluator ID: DJEDW01 Date: 2/19/2011 Period: Completion of study or design <br />Rating <br />" <br />N/A <br />Criteria <br />Schedule - Quality of schedule & adherence to schedule <br />resulting in timeliness and minimizing delay to the owner and <br />community. <br />Cost effectiveness &efficiency - Budget compliance &value of <br />work. <br />Vision - Design - Concepts or adherence to criteria. <br />I Cooperation - Teamwork &relationship with owner, subs and <br />suppliers. <br />Coordination - Ability to organize, schedule and complete <br />000aaa <br />tasks in adherence to the schedule. <br />Accuracy & Technical Skills - Cost estimating, scheduling, <br />shop and other drawings, plans, manuals, project <br />documentation and conflict resolution. <br />Completeness -Compliance with contract documents, permits, <br />Codes &standards. <br />Responsiveness - Timely, clear &concise responses to owner <br />comments and correspondence. <br />Commitment - Intangibles & contribution to project success. <br />10- <br />00000 <br />Personnel - Quality and dedication of project staff. <br />Management - Leadership ability. <br />Quality - Work performed correctly the first time. <br />Overall Performance Average: 4_0 <br />Documentation that supports this evaluation and Contractor's /Consultant's comments can be obtained by <br />contacting: <br />Dan Edwards at Phone# 786 -552 -8354 <br />Evaluation Reviewed by: Supervisor PI Division Chief [' °a Assistant Director 11 Director [_`] <br />The method of delivery of this evaluation to contractor /consultant: Certified Mail 1' l EMail Pv( Fax 11 1 <br />Hand P_::1 <br />(Unresponsive Performance by contractor /consultant requires 2 delivery methods, one MUST be Certified Mail.) <br />Evaluation delivered to: Robert Ross, P.E., Ross Engineering, Inc. <br />Ratina Key <br />4 Superior performance - Exemplary quality, no intervention required - project completed on time or early at or below <br />budget with no change orders or amendments other than owner requested changes. <br />24 <br />http: / /intra.miamidade.gov /CIIS /Contr acts /f - inConti- actorEvaluatioii .asp ?SelCICCNO =O &... 2/19/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.