Laserfiche WebLink
<br />, <br />) <br /> <br />') <br />) <br /> <br /> <br />Protection Resources <br /> <br />T&M PROTECTION RESOURCES, LLC - RFP # 12-01-02 - PAGE 6 <br /> <br />collectively. <br /> <br />) <br />) <br /> <br />. <br /> <br />Project Phase Support: T&M and its team have consulted on numerous master planning and <br />implementation projects and are prepared to provide full project phase support in each of the phases <br />iden tified below. <br /> <br />) <br /> <br />) <br />) <br /> <br />o Request for Proposal Development <br /> <br />) <br /> <br />o RFP Response Review (Bid Assistance) <br /> <br />) <br /> <br />o Construction Administration (Installation Monitoring & Acceptance) <br /> <br />) <br /> <br />. <br /> <br />Fiber Optic Backbone Design: GPI was specifically involved in the fiber optic backbone <br />specification and implementation for the "Ring of Steel" project in NYC previously mentioned. <br />They have a full engineering capability to support this requirement. <br /> <br />) <br /> <br />) <br /> <br />) <br /> <br />. <br /> <br />Central Monitoring Facility Design: SIvI\X1 was selected as part of this team primarily due to their <br />strength in command center design. As will be seen in the section that introduces each company, <br />they have designed control rooms and command centers for such notable projects as the NYC <br />Office of Emergency Management, the Broward County Office of Emergency Management, the Los <br />Angeles Emergency Operations Center and the Office of the Mayor of the City of New York, <br />Situation and Command Center. <br /> <br />) <br /> <br />) <br /> <br />~~ <br /> <br />Schedule of Proposed Services <br />Having carefully reviewed the project scope and requirements as detailed in your RFP and based upon our <br />teams' past experience, we believe that it is most ptudent and cost effective to split the project into two <br />phases as defined below. <br /> <br />Phase 1, would be a needs assessment (Security Master Plan) conducted in concert with representatives of the <br />municipality to identify the nature and extent of security required. Such an assessment would include site <br />visitations and several discussions with municipal leaders, including the local policing authorities, to clearly <br />outline the envisioned needs and threats the municipality wishes to deter, mitigate and monitor. We would <br />review the current levels of security measures in place, how those systems are incorporated with and support <br />daily operations and the potential expandability of any such systems. The road entry points to the city, <br />bridges and sensitive facilities would be assessed and the appropriate security measures ascertained and <br />considered. The team would offer recommendations on the best security systems and operational concepts <br /> <br />T&M PROTECTION RESOURCES, LLC - RFP # 12-01-02 - PAGE 6 <br />230 Park A vcnue, Suitc 440, Ncw York, NY 10 169 . tcl: 212.422.0000 . tax: 212.422.3305 . www.tmprotcction.com <br />This busincss is 1iccnsed by the Ncw York Departmcnt of State, Division of Licensing Scrviccs <br />