Laserfiche WebLink
<br />IIChap~~U! <br /> <br />Hourlv Fee Schedule <br /> <br />Principal.... ................. ............ ...... ....... ....... ..................... .......... ........ .... ................. ............ .... ........,.. $140/Hour <br />Senior Project Biologist... .......... .......... ...... ........... ............ ....... .... ....... ......... ........... ..... ............ .......... $125/Hour <br />Project Biologist ......... ..... ........ ..... ...... ......... ...... ........... .... ......................... ..... ....... .................... ... ....... $95/Hour <br /> <br />GIS Technician......................................................................................................................... .......... $80/Hour <br /> <br />CAD Technician........ .............................................................................................,............................ $75/Hour <br /> <br />Clerical. ..... .......................................... ........ ......... ............. ............. .... ...... ............ ....... ...... ...... ....... ..... $50/Hour <br /> <br />Expert Witness................. .......................................................................,.....................................,... $250/Hour <br />Court Appearances..... ............ ............ ......... ........ ........... ............ ......................... ....... ...................... $250/Hour <br /> <br />Hourly work will be billed at our current prevailing rates; however, these are subject to change due to increasing labor <br />and material costs. No notice of change in prevailing rates shall be required. <br /> <br />Lump Sum Fees <br /> <br />The Lump Sum Fees set forth above are applicable for a period of six (6) months from the date of this proposal. If <br />the work on any item to which a lump sum fee shall apply is not commenced within said period, the firm reserves the <br />right to terminate this Agreement as it relates to said item. No prior notice of such adjustment shall be required. <br /> <br />Cost Estimates <br /> <br />In that our firm does not have control over the cost of labor and materials, or over competitive bidding and marketing <br />conditions, the estimates of construction costs provided by our firm will be made on the basis of our experience and <br />qualifications, but our firm does not guarantee the accuracy of the estimates of probable cost as compared to the <br />contractor's bids. The firm recommends that you consult with the other professionals which you have employed in <br />connection with the project. <br /> <br />Ownership of Documents <br /> <br />All documents including, but not limited to, drawings and specifications prepared in connection with the project <br />constitute the work product of the firm and a portion of the instruments of service with respect to the project. Such <br />documents and/or specifications constitute a portion of the integral services provided by the firm and, as such, are not <br />intended or represented to be suitable for reuse by you or others or for extensions of the project or in connection with <br />any other project. The firm specifically disclaims any responsibility and/or liability for or in connection with the reuse <br />of such documents and/or specifications or any use thereof beyond the scope of the Project as set forth herein. By <br />your execution of this proposal, you agree to indemnify and hold the firm harmless from all claims, damages, losses <br />and expenses including, but not limited to, attorney's fees arising out of or resulting from the reuse or extended use of <br />such documents or specifications. <br /> <br />Permits and Approvals <br /> <br />The permits and agency approvals mentioned above are those known to us to be required for projects of this kind, <br />and we will apply for them as indicated. However, our experience has shown us that agencies and regulatory <br />authorities do not always communicate new regulations and legislation properly and that the enforcement of policies <br />can vary. The Client is therefore cautioned that additional permits or approvals other than those presently identified <br />may be required. Should this arise, we will notify you and respond promptly to the requirement. <br /> <br />Construction Requirements <br /> <br />At the time that the Firm is authorized by you to perform professional environmental services involving design plans <br />and permits requiring approval by governmental agencies, the engineer of record will be required to provide <br />certificates of compliance to those agencies with regard to the performance of certain aspects of the work, which <br />performance will be rendered by others. It will be necessary, therefore, for the firm to perform full-time observation <br />regarding some items and to make periodic site visits for other items to determine whether or not the improvements <br />are in "substantial compliance" with the relevant contract documents. <br /> <br />5 <br /> <br />714 East McNab Road . Pompano Beach. FL J30(\O tel. <j54.n2.190~ fll.\. 954.7~2.11 OK www.thechappellgroup.colll <br />EnvlH>nmcntaJ Consullunls I Marina & Weiland Permining i Phase I ESAs I Mitig,llion Design & MonilOring I T&E Species Surveys <br />4'" <br />t,,~ <br />