My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2012-1862
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2012
>
Reso 2012-1862
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2012 2:20:15 PM
Creation date
3/27/2012 2:51:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2012-1862
Date (mm/dd/yyyy)
03/01/2012
Description
Amd R2012-1834, Increase for Landscape & Fiber Optics Project for Collins (1st Amend)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />City of Sunny Isles Beach <br />18070 Collins A venue <br />Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 City Hall <br />(305) 949-3113 Fax <br />(305) 947-2150 Building Department <br />(305) 947-5107 Fax <br /> <br />City Commission <br />Norman S. Edelcup, Mayor <br />Lewis J. Thaler, Vice Mayor <br />Isaac Aclion, Commissioner <br />Jeanette Gatto, COlllmissioner <br />George "Bud" Scholl, Commissioner <br /> <br />Alan .J. Cohen, City Manager <br />lIans OUinat, City Attorney <br />Jane A. Hines, CMC. City Clerk <br /> <br />MEMORANDUM <br /> <br />TO: The Honorable Mayor and City Commission <br /> <br />FROM: Alan J. Cohen, City Manager <br />DATE: March 1st, 2012 <br /> <br />RE: Increase in the Cost of the Streetscape Project Landscaping Contract <br /> <br />RECOMMENDATION <br /> <br />It is recommended that the City Commission adopt the resolution approving an increase <br />in the cost of the Streetscape Project Landscaping Contract <br /> <br />REASONS <br /> <br />At its meeting of January 19th, 2012 the City Commission authorized the City Manager <br />and City Attorney to negotiate and enter into a contract for the addition of landscaping <br />services to the Collins Avenue Streetscape capital project, in an amount not to exceed <br />$750,000. The original quote provided to the Commission did not include elements that <br />are either necessary and/or desirable to include in the contract. <br /> <br />Previous landscaping improvements of this nature were able to access the utilities and <br />utility infrastructure of one large property owner. During this phase of the Collins <br />Avenue Streetscape project the City is dealing with many smaller property owners and it <br />is necessary for the City to provide its own utility infrastructure for the irrigation and <br />lighting components of the project. This includes the installation of conduit, pipes and <br />master meters, and for directional drilling under side streets and driveways for almost <br />30 blocks of Collins Avenue to install this infrastructure. The additional cost of this work <br />will be approximately $157,000. <br /> <br />While the City is performing this installation, it is desirable to piggyback on this work and <br />install conduit for a fiber-optic system that the City will require as part of its city-wide <br />security system. The additional cost of this will be approximately $83,000, and will be <br />paid for by forfeiture funds. <br /> <br />Agenda Item 4b <br /> <br />Date ::? IJJ \ 1-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.