Laserfiche WebLink
ti✓.SS i ' <br /> A t r <br /> in axioma.alarchitects: 1 <br /> IArchlteaure I Engineering I Interior Design Corporate Office 2 305.667.6333 <br /> Planning I TND I Zoning Approvals 7418 SW 48th Street 305.667,60 <br /> LEER Building Design Miami,FL 33155 I USA .Z rnail@a doma3.com <br /> March 20, 2012 <br /> r <br /> Mr.Alan Cohen <br /> City Manager <br /> City of Sunny Isles Beach <br /> 18070 Collins Avenue <br /> Sunny Isles Beach, FL 33160 <br /> Project: Sunny Isles Beach—Gateway Park <br /> Dear Mr. Cohen, <br /> With regards to the above referenced project and pursuant to issues discussed during our <br /> meeting of 03/19/12 and further items discussed during the meetings of 03102/12; 03/09/12 and <br /> } y� 03/15/12, we hereby provide a revised Summary for all additional items submitted for approval <br /> 11 to the Parking Structure Contract(dated 07/21/11)with a revised Total Project Cost amount. <br /> The following additional items have been considered and acknowledged as part of this proposal <br /> submitted for approval: <br /> 1. Move garage building to the east (approx. 20'-0° from west property line) <br /> accommodating the future service area at northwest corner of the site — this will be <br /> studied during Design Development. <br /> 2. Fire sprinkler system—Provide cost for a total of four(4) levels. <br /> 3. Security system - Provide an allowance for conduit prep work in park and garage. <br /> 4. Restrooms —Total of six(6) stalls for each men and women restroom capacity. <br /> 5. Fence at north side to be 8'-0° high. <br /> 6. Add an entry walkway at the northeast corner of the park. <br /> 7. Leave walkway path all around the Great Lawn at 16'-0° wide but do not use any loose <br /> gravel and provide pavers and sub-surface compaction to sustain a truck. <br /> 8. Make Great Lawn 15 feet wider and reduce the length of the north berm —the height of <br /> the retaining wall to remain while the slope will be greater. <br /> 9. Make sure that the daytime and nighttime lighting is in separate circuit. <br /> 10. Incorporate LED lighting—No fluorescent lighting and leave Park Site Lighting allowance <br /> at$290,000.00. <br /> 11. Make sure that the water features have a covered area for pumps and chemical storage. <br /> 12. Eliminate small berm and provide a seat wall with stone coping at the south edge of park <br /> behind the fence. <br /> Corporate Registration 1 AA0002273 <br /> /0----- <br /> Architect Registration?AR14049 � <br /> s f/;1 <br /> EXHIBIT "A" l <br />