Laserfiche WebLink
<br />'1 <br /> <br />r1 <br /> <br />'1 <br /> <br />1 <br /> <br />r 1 <br /> <br />1 <br />I <br />J <br /> <br />r 1 <br /> <br />L J <br /> <br />c!is <br /> <br />CONSULTANTS, INC. <br /> <br />Professional Experience: 25 yrs <br />Years with Firm: 11 <br /> <br />Education <br /> <br />B.S., Civil Engineering, <br />The University of New York 1983 <br /> <br />Dept. of Business & Regulation, <br />General Contractors Exam, <br />2004 <br /> <br />Registrations <br /> <br />Professional Engineer <br />Florida # 52515 <br />New York #071607 <br />Florida General Contractor <br /># CGC1512966 <br /> <br />Professional Affiliations <br />American Water Works <br />Association (AWWA) <br />Florida Engineer Society <br />National Society of Professional <br />Engineers (NSPE) <br />American Society of Civil <br />Engineer (ASCE) Metropolitan <br />Section <br /> <br />Areas of Expertise <br /> <br />./ Pump Station Design & <br />Improvements <br />./ Program Management <br />./ Construction <br />Management <br />./ Design & Construction. of <br />Water Mains, Sewer <br />Lines <br />./ Canal Improvements <br />./ Project Scheduling <br />./ General Civil Engineering . <br /> <br />Certifications <br /> <br />DesignBuild Project Delivery <br />System <br />Basic Blueprint & Related Math.: <br />Basic Winds load.ASCE 7-05- ". <br />Business Management <br />c.FLBldg. Code Advanced 04 ., <br />Fl Statues Ch. 489 Section. 1 0 1-,~, <br />1.14, <br />,FLWorkers Compensation Law' <br />Wind Mitigation Methodology" <br /> <br />-;~ - ,",':-'i, ' . <br /> <br />Rudy M. Ortiz, P.E., CGC <br />Project Manager <br /> <br />Professional Qualifications <br /> <br />Mr. Ortiz has over 25 years of design and management experience in a <br />variety of civil engineering areas, specializing in the design and <br />construction management of neighborhood improvement projects and <br />water/wastewater facilities. Mr. Ortiz's experience also includes <br />Program Management of fast-track and complex water and <br />wastewater projects, including Consent Decree programs for Miami- <br />Dade County and Puerto Rico. With the City of New York, Mr. Ortiz <br />functioned as Construction Manager, Resident Engineer, and Field <br />Engineer for a variety of multi-million dollar roadway reconstruction and <br />neighborhood improvement projects. <br /> <br />Project Experience <br /> <br />Principal, New 8-lnch DIP Water Main Extension for the Miami-Dade <br />Water and Sewer Department (WASD), Miami-Dade County, Florida - <br />Mr. Ortiz was the Project Manager for the assessment and design of <br />over 3,000 feet of 8-inch water distribution pipeline for the Miami-Dade <br />Water and Sewer Department. The services provided included quality <br />control and project coordination with the Master Consultant, WASD, <br />and permitting agencies. Additional services included project activities <br />scheduling, preparation of engineering cost estimates, and <br />coordination with other stakeholders. <br /> <br />Principal, East Miramar Redevelopment Transmission & Distribution <br />Water Main Improvements, Phase III, Miramar, Florida - Project Mr. Ortiz <br />as Project Manager, was responsible to provide engineering design <br />services for the upgrade of approximately 72,000 L.F. of water mains. <br />The project consists of upgrading existing undersized 2-inch and 4-inch <br />residential water mains to a 6-inch PVC water main. This effort will <br />improve pressure and provide fire protection within the area. Mr. Ortiz <br />worked closely with the client to produce the most technically sound <br />and cost effective design that incorporates all of the client's <br />requirements and needs. <br /> <br />Principal, City of Opa-Locka Canal Improvements, City of Opa-Locka, <br />Florida - Mr. Ortiz was project Principal In Charge during construction <br />oversight services for new canal segments for the City of Opa-Locka. <br />Services provided included canal cleaning, dredging, slope <br />stabilization and landscaping. <br /> <br />Miramar Roadway Infrastructure Project, City of Mlramar, Florida - As <br />Principial In Charge, Mr. Ortiz provided services in monitoring the <br />construction activities throughout the southern half of the City of <br />Miramar. The project consists of the installation of all the water, sewer, <br />and drainage, as well as the expansion of a lift station and over 5 miles <br />of roadway resurfacing. Mr. Ortiz is certifying all improvements being <br />constructed under this contract. <br /> <br />FEMA-DORM Flood Reduction Program, Miami-Dade County, Florida - <br />Mr. Ortiz served as Project Principal for the prime firm, and was <br />responsible for design and construction oversight of roadway <br />improvements as part of the County's flood reduction program. His <br />responsibilities also included planning, design review, and cost estimate <br />preparation for the design of French drainage, roadway resurfacing, <br />and reconstruction work. <br /> <br />'1-' ,"-~. <br /> <br />City of Sunny Isles Beach Continuing Professional Architectural & Engineering Services RFQ 12-04-02 I 22 <br />