Laserfiche WebLink
<br />r 1 <br />r 1 <br />, 1 <br /> <br />1 <br />~ <br /> <br />'-1 <br />J <br /> <br />r 1 <br /> <br />I <br />I ' 1 <br />J <br />I <br /> <br />r, <br /> <br />, , <br /> <br />Qualifications ells <br /> <br />CONSULTANTS, INC. <br /> <br />The CES team has experience providing Miscellaneous Engineering and Construction <br />Management and Inspection Services for other Florida municipalities and has the expertise <br />needed to perform the projects on an as needed basis. <br /> <br />The firm's professional staff has over 100 years of combined design and construction <br />management experience in a variety of professional engineering areas including: Program <br />Management; Project Control/Cost Control; Primavera (P3e) Scheduling; Civil <br />Engineering; Water & Wastewater; structural Engineering; Construction Engineering & <br />Inspection; Permitting Services; and Owner Representation. <br /> <br />CES understands that as Construction Managers, we are the owner's representative in the <br />field and should act as an extension of your staff and strive for our client's best interests. As <br />Construction Managers, first, we look at a project from our client's eyes forming a clear <br />picture of their particular vision and expectations. We develop an understanding of their <br />business, mission, budget goals, schedule and decision-making processes. Finally, knowing <br />our client allows us to think outside of the box, we offer creative solutions to design and <br />construction challenges. <br /> <br />CES approaches Owner/Client coordination and communication by understanding that <br />every project has a number of stakeholders with different needs and opinions regarding <br />the purpose of the project and the means to accomplish it. This means frequent meeting <br />with interested parties, and continual contact bye-mail, telephone and periodic reports as <br />information develops. <br /> <br />Our Management Techniques Include: <br /> <br />· Manage the uncertainty of the early stages of a project or task assignment by meeting <br />with the Owner early on order to better understand the scope of work. This will be done <br />by kick-off meetings, pre-construction meetings and/or brainstorming sessions with all <br />stakeholders. <br /> <br />· At all time, maintain one single point of contact to streamline communication amongst <br />team members, contractors and staff. <br /> <br />· Document Control and Management of staff productivity by systematically following <br />guidelines and procedures for the inspection team, that take into account <br />constructability issues, financial, legal and technical constraints. <br /> <br />· Ensure optimization of the design solution chosen by participating in the Value <br />Engineering and Life Cycle costing studies as needed. <br /> <br />· Manage the construction activities of the project by implementing a very tight QA/QC <br />strategy. <br /> <br />· Manage changes during construction to minimize budget impacts to the project. All the <br />necessary steps will be taken in order to avoid late changes that usually have a potential <br />to disrupt a project's schedule and budget. <br /> <br />City of Sunny Isles Beach Continuing Professional Architectural & Engineering Services RFQ 12-04-02 I 7 <br />