My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-04) Design and Permitting Services for Intracoastal Parks
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2012 2:35:57 PM
Creation date
5/7/2012 2:28:36 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design & Permit. Svcs of Intracoastal Parks
Bid No. (xx-xx-xx)
12-04-04
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />~ ) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br /> <br />Douglas Taylor, PE, Page 2 <br /> <br />Griffin Road, FLj Project Manager, Engineer of Record. Included in this project was the milling and <br />resurfacing of two miles of highway and the addition of two lanes of new roadway to create a four-lane <br />section. This involved the addition of drainage improvements and water quality improvements. <br /> <br />NW 38th Street Improvements, Oakland Park, FL - Project Manager- Mr. Taylor managed the <br />engineering design services for a section of roadway located west of 1-95. The design included paving, base, <br />sub-base, drainage and other utilities. This was an existing 40 year old roadway which was originally <br />designed without consideration of the drainage of areas adjacent to the roadway. This was corrected with <br />the reconstruction. <br /> <br />Bonaventure Development District (BDD), Weston, FL. Mr. Taylor works on various design projects and <br />"troubleshoots" issues related to the District. The Bonaventure Development District (BDD), formerly <br />known as West Lauderdale Water Control District, was first developed in the early 1970's and annexed into <br />the City of Weston in 1997 and encompasses 1,237 acres, to include residential, a major hotel/conference <br />facility, two golf courses and a limited number of commercial properties. <br /> <br />The District's storm water management system consists of canals and lakes interconnected discharging <br />into the South Florida Water Management District (SFWMD) North New River Canal (NNRC). The water <br />quality and discharge rates are permitted to be controlled by two storm water pump stations on the <br />northern boundary of the community. Construction of the principal Drainage Facilities began in 1970 and <br />was completed in 1974. <br /> <br />NW 12th Street Improvements, Oakland Park, FL- Project Manager. Within the CRA redevelopment <br />area, this narrow roadway did not meet the standards required to create an environment conducive to <br />positive economic development of the area. This included widening, on street parking, and the introduction <br />of new landscape and hardscape elements. Services provided included the planning, design, and permitting <br />of roadway, drainage, utility relocation, pavement marking and striping improvements. <br /> <br />Cougar Lane, Coconut Creek, FL-project Manager. Cougar Lane, adjacent to Coconut Creek High School, <br />was a roadway nearing the end of its intended useful design life that was experiencing drainage problems. <br />Services provided included the design, permitting, and construction services for milling and resurfacing of <br />the roadway, utility relocation, and drainage retrofit for one half mile of existing roadway. <br /> <br />Manatee Isles Drive Roadway Project, Weston, FL, Project Engineer. This project for the City of <br />Weston, was designed to widen and provide drainage improvements on Manatee Isles Drive between SW <br />196th Avenue and South Post Road. The project also included milling and resurfacing, median work, <br />installation of curb and gutter, signing and marking upgrades, and a Maintenance ofTraffic plan, in addition <br />to proposed electrical, landscape and irrigation work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.