Laserfiche WebLink
City ofsunny Isles Bench - Acoustical Engineering Services for the Town Center Skate Park - <br />Phase l Assessrnent <br />8, Meetings -Two (2) coordination meetings at the City of Sunny Isles Beach office. <br />9. Ten (10) hardeopies of the Final Report and an electronic copy on CD -ROM will be provided to the <br />CLIENT. <br />10, Expenses - All expenses will be included as pan of the lump -sum compensation package. <br />SCHEDULE <br />The proposed Scope of Services will be completed within ninety (90) days of receiving the official Notice to <br />Proceed (NTP) from the City of Sunny Isles Beach. <br />COMPENSATION <br />The CONSULTANT proposes the work described above will be completed for a lump -sum amount of <br />$49,188.00, including taxes. Below is a schedule for project services and invoicing: <br />1. Field Monitoring and Computer Modeling (40 %) - $19,675.00 <br />2. Draft Report (40%) -$19,675.00 <br />3. Final Report (10 %)- $4,919,00 <br />4. Meetings and Presentation (10%) -$4,919.00 <br />ADDITIONAL SERVICES <br />-- - -. Tlt-ff--Mllawtng -Adds inal- Services - are- rtot- inchnded -in- Basic -- Services -and- are- at- C- UE- I�FT -S- option— T -hese— - - - - -- - <br />services, if exercised by CLIENT and agreed to by CONSULTANT, sball be paid for in addition to compensation <br />for Basic Services, CONSULTANT is not authorized to proceed with performance of any Additional Services <br />unless they are duly authorized, in writing, by CLIENT. <br />• Phase 2 Design and Construction of Sound Mitigation for the Town Center Skate Park <br />• Assistance and / or preparation of the applicable Contractor RFP <br />• Assistance with construction administration <br />• Professional oversight to assist the City of Sunny Isles Beach with the selection and installation of the <br />recommended acoustical materials. <br />Page 3 <br />