Laserfiche WebLink
'r* or sWd F' <br />TO: <br />FROM: <br />DATE: <br />RE: <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />(305) 947 -0606 City Hall <br />(305) 949,3113 Fax <br />MEMORANDUM <br />The Honorable Mayor and City Commission <br />Alan J. Cohen, City Manager <br />6/21/2012 <br />Shoreline Foundation, Inc Construction Change Order #1 through #5 for <br />the Newport Pier Project. <br />RECOMMENDATION: <br />Staff is recommending Commission approve the attached resolution. <br />REASONS: <br />Due to time constraints, the City instructed Shoreline Foundation, Inc. to start <br />construction prior to obtaining all permits. As a result of delays in receiving the permits, <br />the project was halted, and Shoreline demobilized. Upon obtaining the necessary permits <br />to resume work, Shoreline remobilized to continue the project. The remobilization costs <br />were not considered in the original contract and is resulting in a $37,605 change order. <br />The City has a sales tax incentive program in place which allows the City to recognize <br />additional savings after a construction project has been awarded to a contractor. The <br />savings are recognized when the City purchases materials directly from the subcontractor <br />on behalf of the contractor for the benefit of the public project. The City is exempt from <br />paying sales tax, where the contractor is not. The authority to make these purchases is <br />under the master contract. As a result of these direct purchases, the City prepares a <br />deductive change order (for the gross amount) to recognize the decrease in the direct <br />contractual obligation to the vendor. Attached includes deductive change orders #14 for <br />a total of $818,158.79, the City will recognize a savings on these change orders for <br />$40,557.92. <br />FUNDING SOURCE: <br />Funding is available in account number 35- 600 -5670. <br />ail. <br />