Laserfiche WebLink
• <br /> Atlantic Corridor Utility Undergrounding Budget <br /> Station 62 thru 100 3800 <br /> plus East West from Collins to <br /> Atlantic on 175th Terrace 400 <br /> East West on 183rd 500 <br /> 185th thru 191st Station <br /> 94.8-114.2 1940 <br /> Total Atlantic Corridor 6640 <br /> Collins Ave Cost$523/LF <br /> Atlantic Cost $261/LF $1,733,040.00 <br />