My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2667
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2667
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2017 7:16:17 PM
Creation date
3/1/2017 3:16:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2667
Date (mm/dd/yyyy)
02/16/2017
Description
COs 1-6 w/Rohl Networks for Util. Underground/Collins Ave & Atlantic Blvd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RO H L Proposed Change Order <br /> NETWORKS p <br /> PROJECT: TO CONTRACTOR: <br /> Collins Avenue Utility Undergrounding Rohl Networks <br /> City of Sunny Isles Beach 2875 Jupiter Park Dr. STE 900 <br /> 18070 Collins Ave. Jupiter, FL 33458 <br /> Sunny Isles Beach, FL 33160 <br /> Change Order Number: 1 <br /> Date: August 18, 2016 <br /> Architect's Project Number: 15-12-02 <br /> Contract Date: February 18, 2016 <br /> Contract For: Collins Avenue Utility Undergrounding <br /> The Contract is changed as follows: <br /> Add 11,297 lineal feet of 2 additional 2" conduits and vaults in center median from Haulover <br /> Park to Golden Beach for lighting circuits as directed by Engineering Plans and City of Sunny <br /> Isles Beach <br /> The original contract sum was: $6,830,000.00 <br /> The net change by previously authorized Change Orders: $0 <br /> The Contract Sum prior to this Change Order was: $6,830,000.00 <br /> The Contract Sum will be increased by this Change Order in the amount of: $167,760 <br /> The new Contract Sum, including this Change Order, will be: $6,997,760 <br /> The Contract Time will be increased by: 0 <br /> Therefore,the date of Substantial Completion as of the date of this Change Order is: March 31,2017 <br /> NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br /> ARCHITECT CONTRACTOR OWNER <br /> SIGNATURE SIGNATURE SIGNATURE <br /> PRINTED NAME PRINTED NAME PRINTED NAME <br /> DATE DATE DATE <br /> END OF DOCUMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.