Laserfiche WebLink
(d) The Agency will provide one (1) .copy of the final design plans and <br /> specifications and final bid documents to FDOT's Construction Project Manager prior to commencing <br /> construction of the Project. . <br /> (e) The Agency shall hire a qualified contractor using the Agency's normal 'bid <br /> procedures to perform the construction work for the Project. <br /> (f) Prior to commencing the construction work described in this Agreement,the Agency <br /> shall request a Notice to Proceed from FDOT's Construction Project Manager, Local Program Administrator <br /> Aiah Yassin, at(305)470-5485 or from an appointed designee.Any construction work performed prior to the <br /> issuance of the Notice to Proceed for construction is not subject to reimbursement. <br /> (g) The Agency shall hire a qualified CCEI to perform construction oversight including <br /> the obligation to assure that any and all verification testing is performed in accordance with the Standard <br /> Specifications for Road and Bridge Construction, as amended from time to time. FDOT shall have the right, <br /> but not the obligation,to perform independent assurance testing during the course of construction of the <br /> Project. The CCEI firm shall not be the same firm as that of the Engineer of Record for the Project. <br /> (h) The Agency shall require the Agency's contractor to post a payment and performance <br /> bond in accordance with Section 337.18(1), Florida Statutes. <br /> (i) The Agency shall be responsible to ensure that the construction work under this <br /> Agreement is performed in accordance with the approved construction documents, and that it will meet all <br /> applicable Agency standards. <br /> (j) Upon completion of the work authorized by this Agreement,the Agency shall notify <br /> FDOT in writing of the completion of construction of the Project; and for all design work that originally <br /> required certification by a Professional Engineer, this notification shall contain an Engineers Certification of <br /> Compliance, signed and scaled by a Professional Engineer, the form of which is attached hereto as Exhibit <br /> "D". The certification shall state that work has been completed in compliance with the Project construction <br /> plans and specifications. If any deviations are found from the approved plans,the certification shall include a <br /> list of all deviations along with an explanation that justifies the reason to accept each deviation. <br /> Page 8 of 23 <br />