My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2668
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2668
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2017 3:19:50 PM
Creation date
3/1/2017 3:19:46 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2668
Date (mm/dd/yyyy)
02/16/2017
Description
Agmt w/FDOT for N. Bay Road Emergency/Pedestrian Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(d) The Agency will provide one (1) .copy of the final design plans and <br /> specifications and final bid documents to FDOT's Construction Project Manager prior to commencing <br /> construction of the Project. . <br /> (e) The Agency shall hire a qualified contractor using the Agency's normal 'bid <br /> procedures to perform the construction work for the Project. <br /> (f) Prior to commencing the construction work described in this Agreement,the Agency <br /> shall request a Notice to Proceed from FDOT's Construction Project Manager, Local Program Administrator <br /> Aiah Yassin, at(305)470-5485 or from an appointed designee.Any construction work performed prior to the <br /> issuance of the Notice to Proceed for construction is not subject to reimbursement. <br /> (g) The Agency shall hire a qualified CCEI to perform construction oversight including <br /> the obligation to assure that any and all verification testing is performed in accordance with the Standard <br /> Specifications for Road and Bridge Construction, as amended from time to time. FDOT shall have the right, <br /> but not the obligation,to perform independent assurance testing during the course of construction of the <br /> Project. The CCEI firm shall not be the same firm as that of the Engineer of Record for the Project. <br /> (h) The Agency shall require the Agency's contractor to post a payment and performance <br /> bond in accordance with Section 337.18(1), Florida Statutes. <br /> (i) The Agency shall be responsible to ensure that the construction work under this <br /> Agreement is performed in accordance with the approved construction documents, and that it will meet all <br /> applicable Agency standards. <br /> (j) Upon completion of the work authorized by this Agreement,the Agency shall notify <br /> FDOT in writing of the completion of construction of the Project; and for all design work that originally <br /> required certification by a Professional Engineer, this notification shall contain an Engineers Certification of <br /> Compliance, signed and scaled by a Professional Engineer, the form of which is attached hereto as Exhibit <br /> "D". The certification shall state that work has been completed in compliance with the Project construction <br /> plans and specifications. If any deviations are found from the approved plans,the certification shall include a <br /> list of all deviations along with an explanation that justifies the reason to accept each deviation. <br /> Page 8 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.