My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2012-1942
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2012
>
Reso 2012-1942
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 3:10:06 PM
Creation date
8/28/2012 11:14:17 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2012-1942
Date (mm/dd/yyyy)
07/19/2012
Description
Change Order #6 to Agmt w/Shoreline Foundation for Fishing Pier
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As you can see from the diagram above, the location and area of the 24" x 24" precast driven <br />piles would require temporary encroachment onto La Perla property and would have the <br />potential for cracking /spalling of the deck /structure due to vibrations. The revised plan, as <br />shown below, relocates the piles, reduces their size and utilizes an installation methodology <br />which reduces vibrations. Due to the smaller size of these piles, the number of piles required <br />to support the structure is increased from six (6) to eight (8). <br />Deductive Change Order (Credit) for not installing six (6) -24" x 24" Precast Driven <br />Piles: <br />The originally contracted 24" x 24" precast driven piles have an established rate per LF as <br />shown in the contract documents. The breakdown of these costs is shown in Attachment "A" <br />and total to a credit to the contract of $43,795.64. <br />Additive Change Order (Increase) for installing eight (8) —18" round auger cast piles: <br />This scope of work was not originally contemplated in the original contract, thus there is no <br />set value contained in the contractual documents. Attachment "B" contains Shoreline <br />Foundation, Inc (SFI) breakdown of the change order request which totals, $57,094.10. <br />CGA staff has reviewed these change orders with City Staff and a determination was made <br />that the net increase of $13,298.46 is justified in order to minimize the potential impacts to <br />the adjacent existing structures while utilizing the same contractor /contract documents, <br />which ensures that the bonding and insurance is upheld and consistent throughout the project <br />and contractual warranty period. <br />\\CGAFS01 \PR01EC'hPROJECrS\2011\114239 NEWPORT FISHING PIER�CONSTRUCfION\CORRFSPONDENCE \MEMO 20120702 AUGERCAST <br />PILE CO.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.