Laserfiche WebLink
PROJECT: <br />PROPOSAL FORM <br />INTRACOASTAL PARK / COLLINS AVENUE <br />PROPOSAL SUBMITTED TO: CITY OF SUNNY ISLES BEACH <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida <br />PROPOSAL SUBMITTED BY: <br />TENEX ENTERPRISES, INC. <br />850 SW 14M Court <br />Pompano Beach, FL 3 060 <br />Intracoastal Park <br />Page 1 of 1 <br />L� 4.. <br />Item # <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />A <br />Brick Paver Sidewalk <br />1 <br />Concrete Paver Sidewalk on Sand <br />8,000.0 <br />SF <br />$ 4.75 <br />$ 38,000.00 <br />2 <br />Concrete Paver Sidewalk on Concrete <br />1,800.0 <br />SF <br />$ 6.00 <br />$ 10,800.00 <br />4 <br />Clearing & Grubbing, Sod Restoration <br />1.0 <br />LS <br />$ 8,000.00 <br />$ 8,000.00 <br />5 <br />Base Optional (For Sidewalk) <br />888.0 <br />SY <br />$ 8.00 <br />$ 7,104.00 <br />6 <br />6" Header Curb <br />2,050.0 <br />LF <br />$ 12.50 <br />$ 25,625.00 <br />$ 89,529.00 <br />B. <br />Landscape Lighting <br />7 <br />Complete electrical (electrical plan ,panel , etc, for Installation of <br />(84) Flood Lights as specified by city <br />1.0 <br />LS <br />$ 67,000.00 <br />$ 67,000.00 <br />$ 67,000.00 <br />C. <br />Landscaping <br />8 <br />Landscape Installation <br />1.0 <br />LS <br />$ 199,753.36 <br />$ 199,753.36 <br />Including: <br />Removal of Existing Material <br />1.0 <br />LS <br />Relocation of Calophyllum Trees <br />2.0 <br />EA <br />Relocation of Coconut Palms <br />3.0 <br />EA <br />Relocation of Sabal palms <br />1.0 <br />EA <br />Installation of Medjool Palms, 15' CT (25' spacing) *` <br />42.0 <br />EA <br />Installation.of Green Island.Ficus, 3g....(2T spacing) <br />1,758.0 <br />EA <br />Mulch <br />935.0 <br />BAGS <br />Soil <br />36.0 <br />CY <br />Sand <br />42.0 <br />CY <br />$ 199,753.36 <br />D. <br />Irrigation <br />9 <br />Irrigation System <br />1.0 <br />LS <br />$ 6,798.00 <br />$ 6,798.00 <br />Install irrigation system to provide 100% coverage to newly installed <br />material. Tie into existing clock, mainline and backflow preventor. <br />Price includes boring across one street. <br />$ 6,798.00 <br />SUBTOTAL <br />$ 363,080.36 <br />BOND & INSURANCE (2.5 %) <br />$ 9,077.01 <br />PROJECT TOTAL <br />$ 372,157.36 <br />Page 1 of 1 <br />L� 4.. <br />