Laserfiche WebLink
3. Date and time of exposure <br /> 4. Name and address of photographer <br /> 5. Photographer's numbered identification of exposure. <br /> PART 3- EXECUTION <br /> 3.01 TECHNIQUE <br /> A. Factual presentation <br /> B. Correct exposure and focus <br /> 1. High resolution and sharpness <br /> 2. Maximum depth-of-field <br /> 3. Minimum distortion <br /> 3.02 VIEWS REQUIRED <br /> A. Photograph from locations to adequately illustrate condition of construction and <br /> state of progress. <br /> 1. At successive periods of photography, take at least one photograph from <br /> the same overall view as previously. <br /> 2. Consult with the Engineer at each period of photography for instructions <br /> concerning views required. <br /> 3.03 DELIVERY OF PRINTS <br /> A. Deliver 3 sets of prints to the Engineer to accompany each Application for payment. <br /> END OF SECTION <br /> 08/12 01380-2 11-4179 <br />