3.01 PREPARATION <br /> A. The layout of some of the piping systems shown on the drawings may be <br /> diagrammatic, but shall be followed as closely as the work will permit. The <br /> Contractor shall field verify the location and size of existing pipe utilities. <br /> B. Before running lines, the Contractor shall carefully verify location, type of joint <br /> needed and size of pipe to which connection is proposed. He shall then assure <br /> himself that the lines can be run as contemplated without interfering with <br /> footings, walls, other piping, and utilities etc. Any necessary deviation shall be <br /> referred to the Engineer for final adjustment before installation. <br /> C. All lengths of pipe shall be dimensioned accurately to measurement established <br /> at the site, and shall be worked into place without springing or forcing. Cut <br /> sections of pipe shall be reamed to remove all burrs. <br /> D. Utmost care shall be exercised in loading, and placed of all pipe, fittings, valves, <br /> etc., in order to avoid shock and/or damage. Lifting shall be by hoist or skids <br /> when hand lifting is not feasible. Dropping will not be permitted. Pipe handled <br /> on skidways must not be skidded or rolled against pipe already on the ground. <br /> E. Any pipe, special castings, or other appurtenances broken or damaged in transit <br /> to the site where they are to be used, or after they have been delivered to the <br /> site, shall be replaced by the Contractor at his own expense. <br /> F. All pipes and special castings shall be carefully examined for defects, and no <br /> pipe or special casting shall be laid where is known to be defective. If any such <br /> pipe or special casting shall be discovered to be defective after being laid, it shall <br /> be removed and replaced with a sound casting by the Contractor at his own <br /> expense. <br /> G. The Contractor shall cut all pipe and drill all holes that may be necessary, <br /> whenever and wherever so required. This work shall be done in a thorough and <br /> workmanlike manner. <br /> H. The pipe shall be kept clean. All foreign material shall be removed from the <br /> inside of the pipe before it is placed. <br /> 3.02 INSTALLATION OF PIPING <br /> A. Lines, Grades, Stakes and Templates: <br /> 1. The Contractor shall, at his own expense, furnish all templates, patterns, <br /> platforms, and labor that may be required in the layout of any part of the <br /> work. <br /> 2. The Engineer will furnish, upon request by the Contractor, limit marks and <br /> bench marks reasonably necessary for the execution of the work. <br /> 3. The Engineer will furnish a representative to check alignment and grade <br /> after it has been laid out ready for construction; however, this will in no <br /> way lessen the responsibility of the Contractor to maintain correct grade <br /> and alignment at all times. <br /> 08/12 02610-4 11-4179 <br />