Laserfiche WebLink
<br /> <br /> <br />2 <br /> <br /> <br /> <br />6. The area north of the temp construction wall sheet C-4 has no grade <br />elevations. Will fill need to be imported for this area? <br /> <br />For estimating purposes, bidders should assume a flat grade with an <br />average elevation of 7.0. <br /> <br />7. Detail 6 L1.3 shows 4” of concrete under playground safety surface. Does <br />this slab receive wire mesh? <br /> <br />Yes, it is to be included in the unit price for item #47 and #49 playground <br />foundations. <br /> <br />8. Cover sheet states size of the park is 90,952. Please confirm. <br /> <br />This is correct. <br /> <br />9. There is a bench shown on sheet AS 101 please provide specifications. <br /> <br />The bench is a concrete bench, specifications are provided on AS -101. The <br />height of the bench is 16” to match the landscape solid seating. <br /> <br />10. Bid item #2 if for is for removal of concrete pavement, is this for concrete <br />sidewalks? If so please check quantity of 170sy? <br /> <br />This item is for removal of 206 linear feet of existing concrete sidewalk along <br />the east side of Collins Avenue bordering the park. <br /> <br />11. Is this a unit price contract? <br /> <br />Yes. <br /> <br />12. Bid item # 20 has no quantity listed. <br /> <br />Quantity for item #20 is 2,800 SY of gravel pave is for beach maintenance <br />access. <br /> <br />13. The bid form lists unit estimated quantity, unit cost & extended cost, some <br />bid items quantities are listed some are not. Please clarify how we handle <br />this. <br /> <br />The contractor is to perform their own quantity take-offs for the items not <br />provided and show them in the bid tabulation sheet. The bidder is further <br />advised that all quantities shown are estimates only and generally <br />representative of the work that will be required by the Contractor. The <br />Contractor shall be responsible for verifying all quantities prior to bid. Any