Laserfiche WebLink
<br /> <br />Addendum No. 2 <br /> <br />City of Sunny Isles Beach <br />Architectural Design Services for a New Facility at 18080 Collins Ave <br />Request for Qualifications No. 15-04-01 <br />To All Firms: <br /> <br />Firms for the above referenced project shall take note of the following changes, additions, deletions, clarifications, <br />et cetera to the Plans and Specifications, which in accordance with the Contract Documents shall become a part <br />of and have precedence over anything shown or described otherwise. <br /> <br />1. Pull out original RFQ Page # 14 <br />Replace with Revised Page # 14 <br /> <br />2. Pull out original RFQ Page # 17 <br />Replace with Revised Page # 17 <br /> <br />3. Pull out original RFQ Page # 18 <br />Replace with Revised Page # 18 <br /> <br />4. Pull out original RFQ Page # 22-23 <br /> <br />Questions: <br /> <br />Q. I am contacting you on behalf of BEA architects, Inc. to request additional information for RFQ No. 15-04-01, <br />Architectural Design Services for a New Facility at 18080 Collins Avenue. In Section 5, Letter F of the RFQ, it states <br />that “If sub-consultants are a part of the proposed work plan, include items A through D for each firm, including <br />an organizational chart showing the relationship between the responding firm and the sub firm(s).” In terms of <br />what sub-consultants should be providing for the proposal, is this the only section that applies or should their <br />certifications and registrations (i.e. Letter E) also be included? In addition, it states nowhere throughout the RFQ <br />whether or not resumes should be included. Please clarify whether they should be included for the Prime firm, as <br />well as for the sub-consultants, and in which section they should be placed? <br /> <br />A. Replace with Revised Page # 18 <br /> <br />Q. Does the City have a program for the building?