My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 6.6.5 No materials or supplies for the Work shall be purchased by the <br />CONTRACTOR or by any Subcontractor subject to any chattel mortgage or <br />under a conditional sale or other agreement by which an interest is retained <br />by the Seller. The CONTRACTOR warrants that he has good title to all <br />materials and supplies used by him in the Work. <br /> <br />Concerning Subcontractors: <br /> <br /> 6.7 The CONTRACTOR will not employ any subcontractor, other person or <br />organization of the types referred to in paragraph 2.10 (whether initially or as a <br />substitute) against whom the OWNER or the ENGINEER may have reasonable <br />objection, nor will the CONTRACTOR be required to employ any Subcontractor <br />who has been accepted by the OWNER and the ENGINEER, unless the <br />ENGINEER determines that there is good cause for doing so. <br /> <br />Contractor Responsibilities: <br /> <br /> 6.8 The CONTRACTOR shall be fully responsible for all acts and omissions of his <br />Subcontractors and of persons and organizations directly or indirectly employed by <br />them and of persons and organizations for whose acts any of them may be liable <br />to the same extent that he is responsible for the acts and omissions of persons <br />directly employed by him. Nothing in the Contract Documents shall create any <br />contractual relationship between OWNER or ENGINEER and any Subcontractor <br />or other person or organization having a direct contract with CONTRACTOR, nor <br />shall it create any obligation on the part of OWNER or ENGINEER to pay or to see <br />to the payment of any persons due any Subcontractor or other person or <br />organization, except as may otherwise be required by law. OWNER or <br />ENGINEER may furnish to any Subcontractor or other person or organization, to <br />the extent practicable, evidence of amounts paid to CONTRACTOR on account of <br />specific Work done in accordance with the schedule of values. <br /> <br />Identification of Drawings: <br /> <br />6.9 The divisions and sections of the Specifications and the identifications of any <br />Drawings shall not control the CONTRACTOR in dividing the Work among <br />Subcontractors or delineating the Work to be performed by any specific trade. <br /> <br />Subcontractor’s Terms: <br /> <br /> 6.10 The CONTRACTOR agrees to bind specifically every Subcontractor to the <br />applicable terms and conditions of the Contract Documents for the benefit of the <br />OWNER. <br /> <br /> <br /> <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />00700- <br />13 <br />General Conditions <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.