Laserfiche WebLink
Jane A. Smith <br />Joseph B. Williams <br />Tara C. Donovan <br />Chief Architect <br />Chief Mechanical Engineer <br />Chief Electricial Engineer <br />29. EXAMPLE PROJECTS KEY <br />25. Firms from Section C Involved with this Project. Indicate <br />which firms (or branch offices, if appropriate) on the project team <br />were involved in the example project, and their roles. List in the <br />same order as Section C. <br /> <br />Section G. Key Personnel Participation in Example Projects. <br /> <br />This matrix is intended to graphically depict which key <br />personnel identified in Section E worked on the example projects <br />listed in Section F. Complete the following blocks (see example <br />below). <br /> <br />26. and 27. Names of Key Personnel and Role in this <br />Contract. List the names of the key personnel and their <br />proposed roles in this contract in the same order as they appear <br />in Section E. <br /> <br />28. Example Projects Listed in Section F. In the column <br />under each project key number (see block 29) and for each key <br />person, place an "X" under the project key number for <br />participation in the same or similar role. <br />29. Example Projects Key. List the key numbers and titles of <br />the example projects in the same order as they appear in Section <br />F. <br /> <br />Section H. Additional Information. <br /> <br />30. Use this section to provide additional information <br />specifically requested by the agency or to address selection <br />criteria that are not covered by the information provided in <br />Sections A-G. <br /> <br />Section I. Authorized Representative. <br /> <br />31. and 32. Signature of Authorized Representative and <br />Date. An authorized representative of a joint venture or the <br />prime contractor must sign and date the completed form. <br />Signing attests that the information provided is current and <br />factual, and that all firms on the proposed team agree to work on <br />the project. Joint ventures selected for negotiations must make <br />available a statement of participation by a principal of each <br />member of the joint venture. <br /> <br />33. Name and Title. Self-explanatory. <br />STANDARD FORM 330 (REV. 8/2016) <br />PAGE 3 OF INSTRUCTIONS <br />SAMPLE ENTRIES FOR SECTION G (MATRIX) <br />26. NAMES OF KEY <br />PERSONNEL <br />(From Section E, <br />Block 12) <br />27. ROLE IN THIS <br />CONTRACT <br />(From Section E, <br />Block 13) <br />28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in "Example Projects Key" section below first, before <br />completing table. Place "X" under project key number for <br />participation in same or similar role.) <br />1 2 3 4 5 6 7 8 9 10 <br />X X <br />X X <br />X <br />X X <br />XX <br />NUMBER TITLE OF EXAMPLE PROJECT (From Section F)NUMBER TITLE OF EXAMPLE PROJECT (From Section F) <br />XYZ Corporation Headquarters, Boston, MA <br />Founder's Museum, Newport, RI <br />Federal Courthouse, Denver, CO <br />Justin J. Wilson Federal Building, <br />Baton Rouge, LA <br />1 <br />2 <br />6 <br />7