My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
JVA Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Responses
>
JVA Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2012 2:09:17 PM
Creation date
11/26/2012 2:06:03 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FISHING PIER AND RESTAURANT UTILITIES <br /> UNIT PRICE BID SCHEDULE <br /> Bid Estimated Estimated <br /> Item Description Quantity Unit Unit Price Total <br /> 12 Sample Points 3 EA .4,OOD. t 5,cco.00 <br /> 13 Furnish and Install 1° HDPE Service <br /> (Inclusive of saddle, corp. stop, all backfill, <br /> compaction, excavation, bedding, testing, certification <br /> permitting/approval, restoration and connection at <br /> existing bathroom) 90 LF 'x$,00 4r'Eo.co <br /> 14 Furnish and Install 5/8" Meter w/backflow 1 LS 3,1tw.0.3 51100.00 <br /> 15 Furnish and Install 2° HDPE Service <br /> (Inclusive of saddle, corp. stop, all backfill, <br /> compaction, excavation, bedding, testing, certification <br /> permitting/approval, restoration and connection at <br /> building service) 90 LF 2o.co 1,ett.CU <br /> 16 Furnish and install 1° meter w/backflow 1 LS 6,SOD-tX) 6,Soo Cp <br /> 17 Furnish and install 8"x4" Reducer 1 LS 21/4co. u 4co.03 <br /> 18 Connect and Test 8°WM 1 LS Q,cep.00 2,000.3) <br /> 19 Furnish and Install three (3) 2" PVC Communications <br /> Conduits(450 LF trench)(Inclusive of all backfill, <br /> compaction, excavation, bedding, compaction, and <br /> restoration) 1,350 LF (LW 14,2co.co <br /> 20 Furnish and Install 4° PVC Clean Out 1 EA 4w.0) '4ct.cO <br /> 21 Sidewalk Restoration (per FDOT) <br /> 1 LS 41500.00 i,S00.00 <br /> 22 Curb &Gutter Restoration _ _ <br /> 1 LS _ 1500.00 _ 4,SOD.cz <br /> 23 Paver Restoration 1 LS 'tj/ .co 25403,00 <br /> 24 Landscape& Irrigation Restoration 1 LS 3,5oo.0U 3,500.Co <br /> 25 Pavement Restoration (per FDOT specs, full lane <br /> width 100') 1 LS cm co 6,CDO.e p <br /> 26 Sod Restoration 1 LS A,205.06 Vc0.o <br /> 27 Pavement Marking Restoration 1 LS A,5rc.tp 'I.`x040 <br /> 28 Concrete Flume 1 EA $CD(p 50000 <br /> 29 Flare End Curb 6 EA Ai:041V 4,00.00 <br /> Sub-Total Civil 41514CO.00 <br /> TOTAL BASE BID(Items I Thru II) StQz w0.c01 <br /> OWE H4NOMED -t'Vf_)+tt-tvK�W1o+JND. Nt ►1ut.c cd) poLuse/r'm t.Es <br /> ']VL\E.NG, w w a c]nuC¢AGZoi •Iuc Written tl-Zo•It <br /> (Contractor) (Date) <br /> 08/12 00300-3 Addendum#1 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.