Laserfiche WebLink
Created:7/6/12 CH <br /> Revised:8/14/12 AD/CH <br /> Revised:8/16/12 HO <br /> Revised: 10/30/12 CH <br /> Revised:10/31/12 HO/CH <br /> Revised:1 1/5/12 HO <br /> Regulations, the Applicant is requesting the use of graphics and murals on a temporary <br /> construction fence. <br /> IV. ZONING REVIEW <br /> The plans reviewed are on file, and may be examined, in the City Clerk's Office and are <br /> entitled "St. Tropez on the Bay Phase II - Condominium Towers IV & V, Phase III —Office <br /> Building", prepared by axioma3, Inc. consisting of 24 sheets last revised 08.14.2012; the <br /> survey entitled "Plan of Survey", prepared by Mario Prats Jr. & Associates, Inc., <br /> consisting of 3 sheets with a Field Date of May 30, 2012; the Landscape Plan prepared <br /> by EGS2 Corp. consisting of 18 sheets last revised 08.14.2012. <br /> 1. 265-37.F (1) Floor Area Ratio: Phases II & III - Requires City Commission <br /> Approval of TDRs for compliance. <br /> Maximum floor area ratio (265-37.F(1)(a)) Summary Chart E: <br /> Permitted: Base 3.50 (518,444 square feet); with FAR Bonus and TDRs 5.20— <br /> (1,425,314 square feet). <br /> Provided: 4.35 with bonus FAR and TDRs— (1,198,473 square feet) <br /> 2. 265-37.F(5) Lot Coverage : Complies. <br /> Allowed: 90% Maximum - Phase II & III (133,313 sq ft) <br /> Provided: 78% - Phase II & Ill (104,268 sq ft) <br /> 3. 265-37.F(6)(a)[1]:Setbacks and Summary Chart B <br /> I Required I Provided <br /> Phase II (Tower IV &V) <br /> Front (North) <br /> Pedestal 15 feet 15 feet 0 inches <br /> Complies. <br /> Tower 25 feet 32 feet 7 inches <br /> Complies. <br /> Rear(South) <br /> Pedestal 0 feet 13 feet 8 inches <br /> Complies. <br /> Tower 10 feet 43 feet 0 inches <br /> Complies. <br /> Side (East) <br /> Pedestal 0 feet 0 feet 0 inches. <br /> Complies. <br /> Tower 25 feet 46 feet 0 inches. <br /> Complies. <br /> 4 <br /> UAPLANNING&ZONING2008\ZONING HEARING-APPLICATIONS\2012 APPLICATIONNZ2012-09 ST.TROPEZ PHASE II&III <br />