QUALIFICATION INFORMATION + ASSIGNED PERSONNEL I FORM SF 330 D
<br /> Professional Architecture Services for Government Center Lobby+Gateway Park
<br /> I .L'= .,, _v;,C2,,, n__V l� .ti`i Ni,e,_-a V,C:Ci—a :J ..d can r'°_C
<br /> c Jj JCC =.•--j_"..."---/at k Dari;::::_,
<br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Youn Lee,LEED AP S+A Senior Designer a.TOTALb.WITH CURRENT FIRM
<br /> 22 10
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> Song+Associates,Inc. (West Palm Beach,FL)
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> Master in Architecture, LEED° Accredited Professional,2007
<br /> University of Wisconsin,2002
<br /> Bachelor in Engineering,
<br /> Kookmin University, 1991
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> City Center PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> West Palm Beach,FL 2007 2009
<br /> (3)BRIEF DESCRIPTION(Breif scope,size,cost,etc.)AND SPECIFIC ROLE
<br /> a. 1.1 Check if project performed with current firm
<br /> New construction of a sustainable,250,000 sf landmark downtown redevelopment project consisting of the new City Hall(150,000
<br /> sf including Commissioner Chambers and 150 seat auditorium), 85,000 sf Public Library,Photographic Centre and Museum
<br /> and two parking garages housing 900 cars.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Clematis Garage PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> West Palm Beach,FL 2007 2009
<br /> b. (3)BRIEF DESCRIPTION(Breif scope,size,cost,etc.)AND SPECIFIC ROLE ®Check if project performed with current firm
<br /> The Clematis Street Parking Garage is a six-story mixed-use facility with a 600 car parking capacity,two floors of office space for
<br /> the City of West Palm Beach's Parking Administration Department and 2,286sf of retail space on the first floor.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Port St.Lucie Civic Center PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Port St.Lucie,FL 2006 2008
<br /> (3)BRIEF DESCRIPTION(Breif scope,size,cost,etc.)AND SPECIFIC ROLE
<br /> C. ®Check if project performed with current firm
<br /> New construction of the City's 100,000 sf"springboard"project for its new City Center development.The Civic Center includes
<br /> meeting rooms,a banquet hall with commercial kitchen,fitness center,exhibit hall,and outdoor cafe.Design and construction
<br /> included the streetscape leading to the Civic Center and a parking garage to accommodate 800 vehicles.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Indian River Admin Complex PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Vero Beach,FL
<br /> d. —
<br /> (3)BRIEF DESCRIPTION(Breif scope,size,cost etc.)AND SPECIFIC ROLE ®Check if project performed with current firm
<br /> Master Site Plan Project and the Implementation of the Design and Construction of a new 165,000 SF, 14-department County
<br /> Administration Complex for the Board of County Commissioners in Indian River County
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> PBSC Bachelor of Applied Science Building PROFESSIONAL SERVICES(CONSTRUCTION(If applicable)
<br /> Lake Worth,FL
<br /> (3)BRIEF DESCRIPTION(Breif scope,size,cost,etc.)AND SPECIFIC ROLE III Check if project performed with current firm
<br /> i e. This 38,500sf building was commissioned to accommodate the first Bachelor of Applied Science Program,marking its historic
<br /> transition to a four year State educational institution.Achieved LEED Silver certification.
<br /> 1 AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 onoo4) PAGE 2
<br /> SONG +ASSOCIATES 14
<br />
|