I
<br /> QUALIFICATION INFORMATION + ASSIGNED PERSONNEL I FORM SF 330 D
<br /> Professional Architecture Services for Government Center Lobby+ Gateway Park
<br /> h Lam= Ll-} s U- ('') tial`_`k;=,:-1).71.,P32 T-7,D)t II--'' i .n FT,.Je`i
<br /> Fri'9114- .'...i.J:air go=`fes V...-71!-.6 iS�y i y.i
<br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> I Henrique Certad Project Coordinator a.TOTAL b.WITH CURRENT FIRM
<br /> 7 4
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> Bachelor of Arts-Architecture, LEED® Accredited Professional,
<br /> University of Central Venezuela 2001 U.S. Green Building Council
<br /> I
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> I
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> MUNICIPAL COMPLEX PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Coral Springs, FL 2014 N/A
<br /> (3)BRIEF DESCRIPTION(Breit scope,size,cost,etc.)AND SPECIFIC ROLE
<br /> a. ®Check if project performed with current firm
<br /> Master Plan and Programming for the new Municipal Complex which will become the centerpiece and catalyst for economic
<br /> development for the new downtown core of the city. The project is situated on a 6 acre site and may include an approximately
<br /> 75,000 sf city hall,20,000 sf art museum,and 5,000 sf of retail space.
<br /> I (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> MARINA VILLAGE REVITALIZATION PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Riviera Beach, FL 2013 2014
<br /> b. (3)BRIEF DESCRIPTION(Brei/scope,size,cost etc.)AND SPECIFIC ROLE lilCheck if project performed with current firm
<br /> I The Riviera Beach Marina was redeveloped into a regional destination with a 28,000 GSF Event Center, Bicentennial Park Green
<br /> Amphitheatre,new waterfront promenade and plaza,and extensive utility improvements.
<br /> I (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> VILLAGE OF WELLINGTON COMMUNITY CENTER PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Wellington, FL 2014 2016
<br /> C (3)BRIEF DESCRIPTION(Breif scope,size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm
<br /> The 26,000 GSF Community Center involved demolition of an exisiting older structure and construction of a new turnkey facility
<br /> that included a 4,200 GSF EVent Hall,dividable 2,500 GSF multi-purpose room,3 various sized meeting rooms,2 catering kitchens,
<br /> 2 classrooms,fitness room,cafe,outdoor balcony,and an open plaza.
<br /> I (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> MUNICIPAL COMPLEX MASTER PLAN PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Palm Beach Gardens, FL 2014 2016
<br /> (3)BRIEF DESCRIPTION(Breifscope,size,cost,etc.)AND SPECIFIC ROLE Check if project performed with current firm
<br /> d.
<br /> Song + Associates provided Needs Analysis, Programming, Master Planning, andlnceptual Design for all areas of municipal
<br /> government as as well as Community Development,Parks&Recreation,Public Works,Police,and Fire Rescue departments.A master
<br /> plan and conceptual design was developed for new facilities for Public Works and Public Services.Cost estimating was carried out
<br /> I to define budget needs for capital planning.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> PALM BEACH COUNTY TAX COLLECTOR'S OFFICE PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Lake Worth, FL 2014 I 2016
<br /> (3)BRIEF DESCRIPTION(Brei scope,size,cost,etc.)AND SPECIFIC ROLE ®Check if project performed with current firm
<br /> Song+Associates was hired to design the new 37,000 GSF facility to replace the existing Lake Worth and Lantana locations while
<br /> including the Department of Motor Vehicles.Song+Associates designed a front facade with new 20'high storefront glass windows to
<br /> allow natural light to filter into the interior spaces,proactively utilizing the zoning requirements of the pre-existing two story building.
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 2
<br /> SONG +ASSOCIATES 18
<br />
|