I
<br /> QUALIFICATION INFORMATION + ASSIGNED PERSONNEL I FORM SF 330 D
<br /> Professional Architecture Services for Government Center Lobby+Gateway Park
<br /> I E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Aniel Fernandez,P.E., Mechanical Project Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> I LEED AP, 20 2
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> TLC Engineering for Architecture,Inc.—Deerfield Beach,Florida
<br /> I 16. EDUCATION(DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S.in Mechanical Engineering Florida,Mechanical P.E.#66841
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Aniel has over 19 years of experience in mechanical design, consulting engineering and management. His project experience
<br /> I includes: schools,clean rooms,production plants, laboratories, medical office buildings,kitchen ventilation design,and commercial
<br /> office buildings. His field experience includes mechanical and plumbing inspections,and plan review in both fields. Aniel utilizes •
<br /> multiple computer based software, like AutoCAD and Revit, to achieve a high level of design quality and coordination among trades.
<br /> He uses energy simulation software tools to evaluate energy performances which are utilized for conceptual facility designs, State and
<br /> I Federal code compliance, LEED certifications, Energy Star certifications and AIA 2030 Challenge calculations.
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> City of Coral Springs Municipal Complex PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> I Coral Springs, Florida ongoing 2017
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ®Check if project performed with current firm
<br /> Five story municipal building with an adjacent parking garage/retail building. The parking garage consists of post
<br /> a. office space on the ground level; and multi-level parking with an approximate capacity of 300 cars. The municipal
<br /> I building includes offices and commission chambers on the ground floor, offices and meeting areas on the second
<br /> floor, IT offices and fitness center on third floor, and additional office space for government services on the fourth
<br /> and fifth floor. $32,000,000/275,000 sf./ LEED NC 2009/Targeting Silver/Project Role: Project
<br /> Manager/Mechanical Engineer
<br /> Il (1)TITLE AND LOCATION(City and State (2)YEAR COMPLETED
<br /> Deerfield Community Center PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> Deerfield Beach, Florida 2013 2017
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ®Check if project performed with current firm
<br /> II b. Project consists of MEP and FP Services for the construction of a 2400 SF single level community center and
<br /> associated amenities in Deerfield Beach, Fl. LEED or Commissioning services are not required by the project, but
<br /> energy savings elements will be considered where possible. Building will have 2 Multipurpose rooms and support
<br /> spaces. $15,000/2,400 sf Project Role: Project Manager/Mechanical Engineer
<br /> Il
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Riviera Beach Marina District PROFESSIONAL SERVICES(
<br /> ERVICES CONSTRUCTION(if applcable)
<br /> Riviera Beach, Florida 2013 2015
<br /> IC. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ®Check if project performed with current firm
<br /> Redevelopment of the Riviera Beach Marina District,with the first phase consisting of a two-story events center, a
<br /> separate restroom/golf cart garage building and a concession building housing various mechanical functions.
<br /> Provided engineering services for the master plan. $38 million/36,488 sf. Project Role: Project Manager/Mechanical
<br /> 1 Engineer
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Boca West Country Club Expansion Renovation and PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> Improvements 2012 2017
<br /> I Boca Raton, Florida
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE El Check if project performed with current firm
<br /> d. Expansion includes new clubhouse with multifunction space, patio area, meeting room and improvements to
<br /> boutique, locker room, administrative areas, parking, site lighting and entrance. Renovations of Engineering &Cart
<br /> I Storage Building, first and second floors and additional IT equipment with upgrades to HVAC, natural gas feeders
<br /> and electrical systems. Central Chiller Plant for Social Club, Golf Club, Sports Club& Engineering Building
<br /> incorporates new water cooled chiller plant and underground piping. $18 million/146,100 sf. Role: Project
<br /> Manager/Mechanical Engineer
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> City of Wellington Community and Tennis Center, PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> Wellington, Florida 2015 2017
<br /> 1 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE El Check if project performed with current firm
<br /> e. Two-phase project that will provide the Village of Wellington and its residents a state-of-the-art 2,400 sf tennis facility
<br /> and a 25,000 sf community center. Phase I includes 21 hydro clay courts and a two-story 5,500 sf Tennis Pro Shop.
<br /> The courts are designed with cabanas and drinking fountains for the players. Phase 2 includes the new center .
<br /> I complete with meeting and conference rooms, a ball room, commercial kitchen facilities and offices. $3 million/
<br /> 27,400 sf. Project Role: Project Manager/Mechanical Engineer
<br /> SONG +ASSOCIATES 21
<br /> 1
<br />
|