Laserfiche WebLink
I <br /> QUALIFICATION INFORMATION + ASSIGNED PERSONNEL I FORM SF 330 D <br /> Professional Architecture Services for Government Center Lobby+Gateway Park <br /> I E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Aniel Fernandez,P.E., Mechanical Project Engineer a.TOTAL b.WITH CURRENT FIRM <br /> I LEED AP, 20 2 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> TLC Engineering for Architecture,Inc.—Deerfield Beach,Florida <br /> I 16. EDUCATION(DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S.in Mechanical Engineering Florida,Mechanical P.E.#66841 <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Aniel has over 19 years of experience in mechanical design, consulting engineering and management. His project experience <br /> I includes: schools,clean rooms,production plants, laboratories, medical office buildings,kitchen ventilation design,and commercial <br /> office buildings. His field experience includes mechanical and plumbing inspections,and plan review in both fields. Aniel utilizes • <br /> multiple computer based software, like AutoCAD and Revit, to achieve a high level of design quality and coordination among trades. <br /> He uses energy simulation software tools to evaluate energy performances which are utilized for conceptual facility designs, State and <br /> I Federal code compliance, LEED certifications, Energy Star certifications and AIA 2030 Challenge calculations. <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> City of Coral Springs Municipal Complex PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> I Coral Springs, Florida ongoing 2017 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ®Check if project performed with current firm <br /> Five story municipal building with an adjacent parking garage/retail building. The parking garage consists of post <br /> a. office space on the ground level; and multi-level parking with an approximate capacity of 300 cars. The municipal <br /> I building includes offices and commission chambers on the ground floor, offices and meeting areas on the second <br /> floor, IT offices and fitness center on third floor, and additional office space for government services on the fourth <br /> and fifth floor. $32,000,000/275,000 sf./ LEED NC 2009/Targeting Silver/Project Role: Project <br /> Manager/Mechanical Engineer <br /> Il (1)TITLE AND LOCATION(City and State (2)YEAR COMPLETED <br /> Deerfield Community Center PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Deerfield Beach, Florida 2013 2017 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ®Check if project performed with current firm <br /> II b. Project consists of MEP and FP Services for the construction of a 2400 SF single level community center and <br /> associated amenities in Deerfield Beach, Fl. LEED or Commissioning services are not required by the project, but <br /> energy savings elements will be considered where possible. Building will have 2 Multipurpose rooms and support <br /> spaces. $15,000/2,400 sf Project Role: Project Manager/Mechanical Engineer <br /> Il <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Riviera Beach Marina District PROFESSIONAL SERVICES( <br /> ERVICES CONSTRUCTION(if applcable) <br /> Riviera Beach, Florida 2013 2015 <br /> IC. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ®Check if project performed with current firm <br /> Redevelopment of the Riviera Beach Marina District,with the first phase consisting of a two-story events center, a <br /> separate restroom/golf cart garage building and a concession building housing various mechanical functions. <br /> Provided engineering services for the master plan. $38 million/36,488 sf. Project Role: Project Manager/Mechanical <br /> 1 Engineer <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Boca West Country Club Expansion Renovation and PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Improvements 2012 2017 <br /> I Boca Raton, Florida <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE El Check if project performed with current firm <br /> d. Expansion includes new clubhouse with multifunction space, patio area, meeting room and improvements to <br /> boutique, locker room, administrative areas, parking, site lighting and entrance. Renovations of Engineering &Cart <br /> I Storage Building, first and second floors and additional IT equipment with upgrades to HVAC, natural gas feeders <br /> and electrical systems. Central Chiller Plant for Social Club, Golf Club, Sports Club& Engineering Building <br /> incorporates new water cooled chiller plant and underground piping. $18 million/146,100 sf. Role: Project <br /> Manager/Mechanical Engineer <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> City of Wellington Community and Tennis Center, PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Wellington, Florida 2015 2017 <br /> 1 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE El Check if project performed with current firm <br /> e. Two-phase project that will provide the Village of Wellington and its residents a state-of-the-art 2,400 sf tennis facility <br /> and a 25,000 sf community center. Phase I includes 21 hydro clay courts and a two-story 5,500 sf Tennis Pro Shop. <br /> The courts are designed with cabanas and drinking fountains for the players. Phase 2 includes the new center . <br /> I complete with meeting and conference rooms, a ball room, commercial kitchen facilities and offices. $3 million/ <br /> 27,400 sf. Project Role: Project Manager/Mechanical Engineer <br /> SONG +ASSOCIATES 21 <br /> 1 <br />