QUALIFICATION INFORMATION + ASSIGNED PERSONNEL I FORM SF 330 D
<br /> Professional Architecture Services for Government Center Lobby+Gateway Park
<br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Michael Kroll, RLA, FASLA Sr. Landscape Architect a. TOTAL b. WITH CURRENT FIRM
<br /> 32 30
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Miller Legg, Ft.Lauderdale, FL
<br /> 16. EDUCATION(DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> Bachelor of landuape Architecture,landscape Architecture FL Registered landscape Architect
<br /> Graduate Studies Urban and Regional Planning TX Registered Landscape Architect
<br /> Fellow American Society of Landscape Architects
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> During his extensive career,Mr.Kroll President of Miller Legg,has been actively involved in projects ranging from campus-wide educational facilities to international urban redevelopment projects.Mr.Kroll's diverse
<br /> professional experience has led to projects that successfully integrate engineering,environmental planning and landscape architectural services. Under his leadership,Miller Legg develops project solutions that respond
<br /> to the natural environment respect the social fabric and create sustainable aesthetic spaces.
<br /> 19.RELEVANT PROJECTS
<br /> (1) TITLE AND LOCATION(CiryandState) (2)YEAR COMPLETED
<br /> John Knox Village Pompano Beach Welcome Center PROFESSIONAL SERVICES CONSTRUCTION(If
<br /> Pompano Beach, FL Ongoing Applicable)
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> a. Principal-IrrCharge/Project Manager. In preparation for the proposed new Welcome Center at the John Knox Tillage retirement community Pompano Beach campus,Miller Legg was
<br /> retained to perform site development services consisting of planning,engineering and landscape architecture. Preparation of the conceptual site plan entails a review of relevant City of
<br /> Pompano Beach development codes,existing utilities information,the proposed building plan and existing site conditions.Engineering services indude engineering construction document
<br /> production and construction observation.In addition to the City of Pompano Beach,permitting is being coordinated with the Broward County Health Department(BCHD), Environmental
<br /> Protection and Growth Management(BCEPGMD)and South Florida Water Management(SFWMD).A photometric lighting plan for surface parking is also part of the scope.The landscape
<br /> architecture tasks indude tree assessment,removal permitting,planting and irrigation design and construction documents,in addition to construction observation.
<br /> 1 (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> City of Sunny Isles Beach Pelican Community Park PROFESSIONAL SERVICES CONSTRUCTION(If
<br /> Sunny Isles Beach, FL 2008/2013 Applicable)
<br /> 2008/2013
<br /> b. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> Principal-In-Charge:A three-acre active park site,for which Miller Legg managed landscape architecture,irrigation,engineering,surveying and architecture designs for a baseball field,
<br /> recreation building,playground structure,gymnasium,related site amenities and secured a Florida Recreational Development Assistance Program(FRDAP)grant for 5200,000. The Miller
<br /> Legg Team received recognition from the City for their involvement in the design completion. In 2013,the firm provided plans preparation and permitting associated with the
<br /> reconstruction of the natural turf fields at this Park and Senator Gwen Margolis Park with artificial turf.
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Broward College(BC) Bailey Hall Civil& Landscape Architecture PROFESSIONAL SERVICES CONSTRUCTION(If
<br /> Improvements 2014 Applicable)
<br /> Davie, FL
<br /> c (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> Principal-Indharge: Miller Legg was responsible for civil engineering and landscape architecture services associated with the revitalization of the pedestrian and landscape areas located
<br /> adjacent to Broward College Davie Campus Buildings 3,4, 5&6.The project began with the demolition of the existing concrete courtyard area and the installation of pavers between
<br /> Buildings 3 and 4. Landscaping was also installed in and around those buildings to create an aesthetically pleasing walking environment Civil engineering services provided indude
<br /> demolition,paving,grading and permitting.Landscape architecture services consisted of hardscape,landscape and irrigation.
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> St. Paul the Apostle Community Center Expansion PROFESSIONAL SERVICES CONSTRUCTION(If
<br /> Lighthouse Point, FL Ongoing Applicable)
<br /> d. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> Principal-In-Charge/Project Manager.Miller Legg was retained to provide site development services for a 2,500 sf addition to the existing Community Center at St Paul the Apostle Church
<br /> in lighthouse Point Among the landscape architecture tasks entailed are tree removal permitting,planting and irrigation design development and construction documents,and landscape
<br /> construction observation.The civil engineering scope of work indudes on-site engineering design and construction documentation,conceptual water management planning,bidding
<br /> assistance and contract administration and construction observation.Government permitting is being coordinated for approval through BCHD,BCEPGMD,SFWMD and the City.
<br /> (I) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Nicklaus Children's Hospital (NCH)Tomotherapy Building Site Design PROFESSIONAL SERVICES CONSTRUCTION(If
<br /> Miami, FL Ongoing Applicable)
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> e.
<br /> Principal-In-Charge/Project Manager.Among the services being rendered by Miller Legg for the Nicklaus Children's Hospital(NCH)main campus new Tomotherapy building are site plan
<br /> coordination,landscape architecture/irrigation and civil engineering site design.The landscape architecture/irrigation services include construction document preparation,bidding and pre-
<br /> construction assistance,and construction administration.On the civil side,the firm is handling site civil and utility infrastructure construction document preparation and agency
<br /> permitting,site civil bidding assistance,as well as pre-construction services and construction administration.Permitting is coordinated with Miami-Dade WASD,Public Works,DERN,Fire
<br /> and Health Departments. Tree mitigation services involve the creation of a tree inventory plan and preparation of a tree removal permit application.
<br /> STANDARD FORM 330(REV.8/2016)PAGE 2
<br /> SONG +ASSOCIATES MILLER 'LEGG 24
<br />
|