My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ 18-02-01 Marine and Coastal Professional Engineering Consulting Services
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
RFQ 18-02-01 Marine and Coastal Professional Engineering Consulting Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 3:58:51 PM
Creation date
3/5/2018 3:57:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |Request for Qualifications No. 18-02-01 18 <br /> <br />Section 3 <br />Scope of Services / Technical Specifications <br /> <br />3.1 SCOPE OF SERVICES <br /> <br />The selected firm shall demonstrate specific experience and capabilities and must have personnel qualified <br />through education and experience in the specified disciplines. The firm shall provide coastal erosion risk <br />and mitigation assessments, including but not limited to: data collection, construction layout, pro-active <br />cost effective short term and long-term solutions, innovative methods for beach preservation, restoration <br />and nourishment, and coastal monitoring. A detailed scope of work will be developed for each work orde r <br />issued. The Consultant shall be familiar with and experienced in conducting shoreline and wave modeling <br />procedures and analyzing accretion and erosional trends for the design of a nourishment project and for <br />acquisition of project permits. Consultant shall provide design, construction documents, construction <br />administration and various reports for Marine and Coastal engineering related projects. Consultant shall <br />apply for, process and obtain permits from various regulatory agencies. Successful respondents shall <br />comply with all local, state, and federal directives, ordinances, rules, orders, and laws as applicable to this <br />RFQ and subsequent contracting. <br /> <br />Firm must demonstrate experience with designing erosion mitigation structures (jetty’s, breakwaters, t - <br />groins, reefs balls, etc.). In addition, firm must be familiar with The Coastal Construction Control Line <br />Program (CCCL) an essential element of Florida's coastal management program, w hich provides protection <br />for Florida's beaches and dunes while assuring reasonable use of private property. Recognizing the value <br />of the state’s beaches, the Florida legislature initiated the Coastal Construction Control Line Program to <br />protect the coastal system from improperly sited and designed structures that can destabilize or destroy <br />the beach and dune system. Adoption of a coastal construction control line establishes an area of <br />jurisdiction in which special siting and design criteria are applied for construction and related activities. <br />These standards may be more stringent than those already applied in the rest of the coastal building zone <br />because of the greater forces expected to occur in the more seaward zone of the beach during a storm <br />event. <br /> <br />The Respondent shall perform functions including, but not limited to the following: <br /> <br />A. Beach/ Marine/ Intracoastal Waterway Engineering Services: Provide general mitigation <br />consultation for beach and intracoastal waterway, marine, field and underwater engineering and marine <br />inspections and survey, coastal construction supervision, feasibility analysis (economic and engineering) <br />general reevaluation reports, coastal construction design and permitting services. The Consultant should <br />have experience with and be prepared to assist the City in addressing Public Law 84-99 Flood Control and <br />Coastal Emergency Act, assessment and support related to emergency funding in the event of a storm <br />striking the City of Sunny Isles Beach. <br /> <br />B. Environmental Engineering Services: Provide general consultation, environmental engineering <br />design, construction documents, construction administration services, on -site representation, preliminary <br />budget estimates, and service to secure building and all other required permits and other Environmental <br />Engineering Services for the City of Sunny Isles Beach for miscellaneous Environmental Engineering <br />Projects. The Consultant may be requested to provide services related to hazardous waste remediation,
The URL can be used to link to this page
Your browser does not support the video tag.