My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-1115 Regular City Commission Meeting
SIBFL
>
City Clerk
>
City Commission Minutes
>
2012
>
2012-1115 Regular City Commission Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2013 9:11:39 AM
Creation date
1/8/2013 9:11:34 AM
Metadata
Fields
Template:
CityClerk-City Commission
Meeting Type
Regular
Date (mm/dd/yyyy)
11/15/2012
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary Minutes:Regular City Commission Meeting November 15,2012 City of Sunny Isles Beach,Florida <br /> architectural commission and pay them their loss of equity. Their units start at$3 Million for <br /> 3,100 square feet. What this project will do is add value to both of its neighbors and the entire <br /> City by basically increasing the price per square foot over units that exist today because they <br /> are larger units. All in all,what is the prejudice to them,they are paying interest of$200,000 <br /> a month on those properties, and every day is basically equity out of their pocket. <br /> Mayor Edelcup asked the City Attorney and City Planner if proper notice was given, if there <br /> are any violations, and if there are any variances being requested or is this a waiver of a <br /> setback. City Attorney Ottinot responded that yes proper notice was given,individual notice <br /> was required to be issued at least 10 days prior to this hearing to the property owners that are <br /> within 300 feet of the proposed project and those notices went out in addition to the <br /> newspaper notice. In addition, today staff got its first request to meet representatives from <br /> Ocean Four without an appointment,they met with them. Carlos Gimenez is the attorney of <br /> record and was on the phone, and not all of these issues were raised. City Attorney Ottinot <br /> disagreed that there were any Code violations, they reviewed this project for at least two <br /> months. They had indicated to the Applicant that they have to comply with the City Code. <br /> City Planner Claudia Hasbun said in regards to the building width, the envelope of the <br /> building is measured from exterior wall to exterior wall,and the extension of five feet on each <br /> side,there are no balconies, it is just an architectural embellishment of the building. <br /> Mayor Edelcup said he thinks we had an issue before with another building that were not <br /> enclosed balconies,we had the same issue at that point and we came to the conclusion that it <br /> was not an encroachment. Ms. Hasbun said correct, and the embellishment comes from the <br /> 9th floor, from 95 feet in height, that is the initial point of base embellishment up to the 415` <br /> floor. In regards to the setback,the pedestal of the building is nine(9)feet tall,and our Code <br /> calls for the first six(6)feet to be at the property line,and they chose not to go to the property <br /> line because it is extending another three (3) additional feet and they are providing four(4) <br /> feet and six (6) inches on each side, north and south. Mayor Edelcup said that the beach <br /> access is not a variance but a waiver request, and Ms. Hasburn said the beach access is not a <br /> variance, it is that beach waiver as is in our Code. City Attorney Ottinot said not only was <br /> this plan reviewed by Ms.Hasbun but it was also reviewed by Alex David who also works for <br /> the City as a consultant. All of us concur that there was no Code violation based on plans <br /> submitted. Alex David of the Bell David Planning Group said that he concurs with what City <br /> Planner Hasbun just said. <br /> Commissioner Aelion said every time a new project site plan is presented to the Commission <br /> similar issues arise of the inconvenient element attached to the erection of such a structure. <br /> All the architecture is different on the beach, there is no architecture continuity of these <br /> structures, they are all different. As far as the protrusion of the art work on each side, it is <br /> something that really starts at a certain height like 95 feet. The art work on similar buildings <br /> on the south side that have had such protrusions,and even the Acqualina has balconies which <br /> allowed for the long distance which are much more obtrusive than an architectural structure. <br /> However, he is concerned with the egress and ingress of large vehicles like a garbage truck, <br /> and he asked Kobi Karp if he made allowances for them. Mr. Karp said yes, they met with <br /> staff, the Fire Department, and Waste Management and it is all sorted out. Commissioner <br /> Aelion asked about the art structure in the front of the building, is the engineering made in <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.