My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
Responses
>
Cummins Cederberg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 9:57:53 AM
Creation date
3/23/2018 9:52:14 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Marine and Coastal Professional Engineering Consulting Svcs
Bid No. (xx-xx-xx)
18-02-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />a. PROJECT OWNER <br />21. TITLE AND LOCATION (City and State) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />a. <br />b. <br />c. <br />d. <br />e. <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />b. POINT OF CONTACT NAME <br />23. PROJECT OWNER'S INFORMATION <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />Project Scope & Size: This facility is the entry and focal point of Douglas Park. It will be constructed in an environmentally sensitive area (Contaminated) and <br />on structural piles. It will consist of Multi-purpose space, administrative offices, snack bar / kitchen, public restrooms, park maintenance storage space, <br />classroom and crafts spaces, NET office and multi-purpose outdoor courtyard. The project is in building permit phase and will begin construction in early 2018. <br />Project Relevance: R.E. Chisholm Architects services include Planning, Programming and Design, Technical Documents, Construction Management and <br />Construction Administration. <br />Project cost: $3.0M
The URL can be used to link to this page
Your browser does not support the video tag.