My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
Responses
>
Cummins Cederberg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 9:57:53 AM
Creation date
3/23/2018 9:52:14 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Marine and Coastal Professional Engineering Consulting Svcs
Bid No. (xx-xx-xx)
18-02-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach |Request for Qualifications No. 18-02-01 29 <br /> REFERENCE QUESTIONNAIRE <br />It is the responsibility of the consultant to provide a minimum of three (3) different government agency reference <br />other than City of Sunny Isles Beach using this form and providing this information with your submission. Failure <br />to do so may result in the rejection of your submission. <br />Giving reference for: (Bidder) _______________________________________________________________ <br />Firm giving Reference: ____________________________________ _______________________________ <br />Address:___________________________________________ Phone: ___________________________________________ <br />Fax: ______________________________________________ Email: ___________________________________________ <br />1.Q: What was the title of the contract or job assigned to Bidder? <br />A: <br />2.Q: What was the scope of work/services assigned to Bidder? <br />A: <br />3.Q: Have there been any change orders, and if so how many? <br />A: <br />4.Q: Do they perform on a timely basis as required by the agreement? <br />A: <br />5.Q: Was the project manager easy to get in contact with? <br />A: <br />6.Q: Would you use them again? <br />A: <br />7.Q: Overall, what would you rate their performance? <br />A: <br />8.Q: Is there anything else we should know, that we have not asked? <br />A: <br />The undersigned does hereby certify that the foregoing and subsequent statements are true and <br />correct and are made independently, free from vendor interference/collusion. <br />Name: _______________________________________ Title _____________________________________________ <br />Sign Name: __________________________________ Date: ___________________________________________ <br />Cumming Cederberg Coastal and Marine Engineering <br />City of Marathon <br />9805 Overseas Hwy, Marathon FL 33050 305-289-5008 <br />solisc@ci.marathon.fl.us <br />Coco Plum Beach Erosion Control Study <br />Analyze existing condition and erosion issues, and provide alternative to mitigate issues. <br />No <br />Yes <br />Yes <br />Yes <br />Very Good <br />consultant was very knowledgable and provided well documented information easy to understand <br />Carlos A. Solis, P.E.Director of Public Works & Engineering <br />3-19-18
The URL can be used to link to this page
Your browser does not support the video tag.