Laserfiche WebLink
City of Sunny Isles Beach, Florida   <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01  <br />  <br />  <br />Aptim Environmental & Infrastructure, Inc.  <br />35  <br />01C032018D  <br />  <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT  <br />(Complete one Section E for each key person.)  <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE  <br />Gary Krystyniak  Senior CAD Designer a. Total 30  b. With Current Firm 7  <br />15. FIRM NAME AND LOCATION (City and State)  <br />Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL  <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)  <br />BS/2003/Behavioral Science  GIS Professional (GISP), GIS Certification Institute, Des  <br />Plaines, IL, 2011  <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)  <br />Gary Krystyniak joined APTIM in 2011 and has over 30 years of design and drafting experience. His experience includes  <br />various aspects of marine and port design including surface modeling, dredge volume calculations, scheduling,  <br />conceptual drawings structural and mechanical drawings, as well as 3‐D graphics and animation. Mr. Krystyniak is  <br />proficient in numerous design software, including AutoCad®, Microstation®, InRoad®s, Softdesk®, Land Development®,  <br />Autodesk Civil 3D®, Bentley PowerCivil®, and Eaglepoint®.  <br />19. RELEVANT PROJECTS  <br />a.  <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  <br />Coastal Design and Drafting Projects, Multiple Locations, U.S. – Aptim  <br />Environmental & Infrastructure, Inc.  <br />PROFESSIONAL SERVICES CONSTRUCTION (If  <br />applicable)  <br />Ongoing  N/A  <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  <br />Senior CADD Designer – Worked on numerous coastal engineering projects. Select project experience includes:  <br /> Lido Key Tropical Storm Debby Repair Project Construction Plans   <br /> Town of Hillsboro Beach/City of Deerfield Beach Interim Beach Renourishment   <br /> Town of Palm Beach Southern Palm Beach Island Comprehensive shoreline stabilization Project   <br /> Indian River County Sector 3 Beach Renourishment Project   <br /> Lido Key Tropical Storm Debby Repair Project Permit Plans   <br /> Southern Palm Beach Island Comprehensive Shoreline Stabilization Project, Town of Palm Beach, Florida  <br /> Fire Island Inlet to Moriches Inlet Emergency Stabilization, Fire Island, New York   <br /> North Topsail Beach Shoreline Protection, North Topsail Beach, North Carolina   <br /> Collier County 2013‐2014 Beach Renourishment   <br /> City of Miami Curtis Park Boat Ramp Improvements  <br /> Seawinds Seawall Construction Project   <br /> Upham Beach Stabilization Project   <br /> Delray Beach Fifth Beach Renourishment   <br /> Pelican Landing Erosion Control Project   <br /> New River Inlet Channel Realignment and Beach Restoration   <br /> Pellicer Flats Mitigation Bank  <br /> West Belle Pass Barrier Headland Restoration Project   <br /> Shell Island Barrier Enhancement   <br /> Pelican Island Restoration Project   <br /> Port Mearim Brazil Port Development Project   <br /> Anna Maria Island Geotextile Tubes  <br /> Panama City Beach Renourishment  <br /> Captiva/Sanibel Island Beach Renourishment  <br />