My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APTIM
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
Responses
>
APTIM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 10:44:15 AM
Creation date
3/23/2018 10:35:10 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Marine and Coastal Professional Engineering Consulting Svcs
Bid No. (xx-xx-xx)
18-02-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach, Florida <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01 <br /> <br /> <br />Aptim Environmental & Infrastructure, Inc. <br />35 <br />01C032018D <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE <br />Gary Krystyniak Senior CAD Designer a. Total 30 b. With Current Firm 7 <br />15. FIRM NAME AND LOCATION (City and State) <br />Aptim Environmental & Infrastructure, Inc. | Boca Raton, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />BS/2003/Behavioral Science GIS Professional (GISP), GIS Certification Institute, Des <br />Plaines, IL, 2011 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Gary Krystyniak joined APTIM in 2011 and has over 30 years of design and drafting experience. His experience includes <br />various aspects of marine and port design including surface modeling, dredge volume calculations, scheduling, <br />conceptual drawings structural and mechanical drawings, as well as 3‐D graphics and animation. Mr. Krystyniak is <br />proficient in numerous design software, including AutoCad®, Microstation®, InRoad®s, Softdesk®, Land Development®, <br />Autodesk Civil 3D®, Bentley PowerCivil®, and Eaglepoint®. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Coastal Design and Drafting Projects, Multiple Locations, U.S. – Aptim <br />Environmental & Infrastructure, Inc. <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br />Ongoing N/A <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Senior CADD Designer – Worked on numerous coastal engineering projects. Select project experience includes: <br /> Lido Key Tropical Storm Debby Repair Project Construction Plans <br /> Town of Hillsboro Beach/City of Deerfield Beach Interim Beach Renourishment <br /> Town of Palm Beach Southern Palm Beach Island Comprehensive shoreline stabilization Project <br /> Indian River County Sector 3 Beach Renourishment Project <br /> Lido Key Tropical Storm Debby Repair Project Permit Plans <br /> Southern Palm Beach Island Comprehensive Shoreline Stabilization Project, Town of Palm Beach, Florida <br /> Fire Island Inlet to Moriches Inlet Emergency Stabilization, Fire Island, New York <br /> North Topsail Beach Shoreline Protection, North Topsail Beach, North Carolina <br /> Collier County 2013‐2014 Beach Renourishment <br /> City of Miami Curtis Park Boat Ramp Improvements <br /> Seawinds Seawall Construction Project <br /> Upham Beach Stabilization Project <br /> Delray Beach Fifth Beach Renourishment <br /> Pelican Landing Erosion Control Project <br /> New River Inlet Channel Realignment and Beach Restoration <br /> Pellicer Flats Mitigation Bank <br /> West Belle Pass Barrier Headland Restoration Project <br /> Shell Island Barrier Enhancement <br /> Pelican Island Restoration Project <br /> Port Mearim Brazil Port Development Project <br /> Anna Maria Island Geotextile Tubes <br /> Panama City Beach Renourishment <br /> Captiva/Sanibel Island Beach Renourishment <br />
The URL can be used to link to this page
Your browser does not support the video tag.