My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Superior Landscaping
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-03-03) Right-of-Ways and Facilities Landscape Maintenance Services
>
Responses
>
Superior Landscaping
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 4:20:24 PM
Creation date
4/25/2018 2:55:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Right-of-Ways and Facilities Landscape Maintenance Services
Bid No. (xx-xx-xx)
18-03-03
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f4 01 sista h�iy <br />10 <br />A10 <br />North Bay Road (from S. Isles Blvd. to 172 St.) <br />52 Weeks <br />$ 139.00 <br />$ 7,228.00 <br />11 <br />172"d Street <br />A11 <br />(from N. Bay Road to Collins Ave.) <br />52 Weeks <br />$ 119.00 <br />$ 6,188.00 <br />12 <br />175th Terrace <br />Al2 <br />(from Atlantic Blvd. to Collins Ave.) <br />52 Weeks <br />$ 40.00 <br />$ 2,080.00 <br />13 <br />North Bay Road <br />A13 <br />(from 174 St. to 183 St.) <br />52 Weeks <br />$ 199.00 <br />$ 10,348.00 <br />14 <br />A14 <br />Atlantic Boulevard <br />(from 175 Terr. to 183 St.) <br />52 Weeks <br />$ 239.00 <br />$ 12,428.00 <br />15 <br />177th Drive <br />A15 <br />(from Church Dr. to Atlantic Blvd.) <br />52 Weeks <br />$ 30.00 <br />$ 1,560.00 <br />16 <br />A16 <br />Church Drive <br />52 Weeks <br />$ 30.00 <br />$ 1,560.00 <br />(from 178 Dr. to 177 Dr.) <br />17 <br />178th Drive <br />A17 <br />(from N. Bay Rd. to Collins Ave.) <br />52 Weeks <br />$ 35.00 <br />$ 1,820.00 <br />18 <br />178th Street <br />A18 <br />(from N. Bay Rd. to 178TH St) <br />52 Weeks <br />$ 49.00 <br />$ 2,548.00 <br />19 <br />179th Drive <br />A19 <br />(from N. Bay Rd. to 178 St.) <br />52 Weeks <br />$ 49.00 <br />$ 2,548.00 <br />20 <br />180th Drive <br />A20 <br />(from N. Bay Rd. to Atlantic Blvd.) <br />52 Weeks <br />$ 49.00 <br />$ 2,548.00 <br />21 <br />A21 <br />181St Drive <br />(from N. Bay Rd. to Atlantic Blvd.) <br />52 Weeks <br />$ 54.00 <br />$ 2,808.00 <br />22 <br />A22 <br />182"d Drive <br />(from N. Bay Rd. to Atlantic Blvd.) <br />52 Weeks <br />$ 54.00 <br />$ 2,808.00 <br />23 <br />A23 <br />183rd Street <br />52 Weeks <br />$ 60.00 <br />$ 3,120.00 <br />(from North Bay Road to Collins Avenue.) <br />24 <br />A24 <br />N. Bay Road Pedestrian Emergency Bridge <br />52 Weeks <br />$ 60.00 <br />$ 3,120.00 <br />from 174th St. to 172nd St. <br />City of Sunny Isles Beach I ITB 18-03-03 Right -of -Ways and Facilities Landscape Maintenance Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.