My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Bay Road Drainage Improvements
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
North Bay Road Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 4:14:30 PM
Creation date
5/2/2018 4:09:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SUNNY ISLES BEACH SECTION 02762 - 2 <br />TELEVISING STORM SEWER SYSTEMS <br /> <br />Contractor will be PACP compliant. An electronic database will be provided by the <br />Contractor in a PACP exported format approved by the Owner. <br /> <br />C. The Contractor shall provide comments as necessary to fully describe the existing <br />condition of the storm sewer on the inspection forms. <br /> <br />D. Contractor shall be responsible for modifications to equipment and/or inspection <br />procedures to achieve report material of acceptable quality. <br /> <br />E. No Work shall commence prior to approval of the submitted material by the Owner. <br />Once accepted, the report material shall serve as a standard for the remaining <br />Work. <br /> <br />1.3 QUALITY ASSURANCE <br /> <br />A. Qualifications: Firms regularly engaged in the cleaning and televising of <br />storm/sanitary sewer systems for not less than 5 years. <br /> <br />B. Each CCTV field inspection supervisor shall be NASSCO PACP certified. Use of <br />PACP certified technicians to review/document defects in the office (post process) <br />is not acceptable. <br /> <br />C. The inspection Contractor must have an internal quality assurance/quality control <br />program in place and all inspection data shall be subjected to the procedures prior <br />to submittal to the Owner. The Owner will perform QA/QC audits on submitted <br />data. <br /> <br />D. QA/QC shall be performed by NASSCO PACP certified personnel. <br /> <br />1.4 SUBMITTALS <br /> <br />A. Submittals shall be submitted to the Owner for review and acceptance prior to <br />construction in accordance with the General Requirements Section 00500 and <br />Submittal Section 01300. <br /> <br />B. The following deliverables shall be submitted on a portable hard drive at the <br />completion of inspection: <br /> <br />1. Inspection videos saved in MPEG format or Windows Media video format. <br /> <br />2. Electronic version (.pdf) of the pipe inspection reports. <br />
The URL can be used to link to this page
Your browser does not support the video tag.