Laserfiche WebLink
1 <br /> 19. CASH ALLOWANCES <br /> 19.1 The Bidder is advised that a space is provided in the Bid Form, Document <br /> 00300, for this purpose only. The Contractor shall not proceed on any <br /> additional work to be covered by allowances until authorized in writing by <br /> 1 the Engineer. Such work shall be approved by the Owner, shall be within <br /> the scope of work defined by this Contract and shall not exceed the <br /> amount indicated in the Bid Form. Any amount remaining in the Cash <br /> Allowance will be retained by the Owner. <br /> END OF DOCUMENT <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> I <br /> m <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 05/08 Final Version 00100-9 05-4893 <br />