City of Sunny Isles Beach <br /> RFP 18-04-02 Disaster Debris Management and Disposal Services <br /> 0 ■ Two laborers with chain saws and rakes <br /> • Two flag persons <br /> • One Bucket Truck with an experienced operator or climber(optional based on need) <br /> • One Foreman with cell phone and pickup <br /> The number of Cut and Push Crews will be determined by the City. Ceres owns eight (8) wheel loaders <br /> (with appropriate grapple attachments) and has additional subcontractor supplied pushing equipment. <br /> Ground personnel will be supplied with sufficient types and quantities of tools and materials to effectively <br /> push the debris to the roadside to clear routes for emergency traffic. In the event debris cannot be pushed <br /> aside, it will be loaded in trucks and transported to nearby off-street locations for temporary dumping, to be <br /> picked up later by the normal debris clearing crews. When each assignment is complete, Ceres' crews will <br /> contact the City's dispatcher to obtain authorization to proceed to the next assignment. <br /> Debris Collection <br /> Crews will be dispatched to begin work within two days, and according to the City's priorities and the <br /> removal schedule adopted in coordination with the City representative. At the direction of the Ceres field <br /> supervisor each assigned debris removal crew will service each assigned road or right of way. Daily <br /> meetings will be conducted at 7:00 AM between the City and Ceres. Zones and Sections will be identified <br /> and prioritized. Progress will be updated and reported to the City at the close of business each day. <br /> Additional passes will be conducted prior to project completion in agreement with the City or per contractual <br /> requirements, to ensure adequate time has been scheduled for residents to move their debris into the right <br /> of way. <br /> A typical crew will be comprised of: <br /> • One Knuckleboom Loader(or one ; `` r <br /> 4-cubic yard wheel loader with ' fl '471 <br /> grapple) .ft <br /> 77.4 <br /> • One Bobcat with grapple '0,,, <br /> • Two laborers with chain saws and '` �s. <br /> rakes "''..✓; ,�: :`. h`.= ;.-,:in‘.:!• <br /> f , i� s4_;: <br /> • Two flag persons `--- .i' g ° _ `, ,,,. . ,t ,., <br /> • One Foreman with cell phone and ..,...city �:1I 1 <br /> �- <br /> pickup truck (one foreman/ three � _ ���j �� � 3 n � ,��' 4� ' '! <br /> crews) ��.� �.S lir j � }j • , t t<_ , H ��_ <br /> • GPS Tracking and Navigation , v -,ID ,..-_,- _,_,— ._,„2...„_•� •_ ,_,j � `-� <br /> Aids .,�4 , , a.1 ( �.N .._/ <br /> Three hauling trucks or trailers f _ T^ , - " : <br /> (30 - 50 cubic yards). _�, 4 ,.:=-:;t;',.-.: .._ , <br /> Additional/large capacity trucks a^ °. ,' , ,,;;, ` -.L..5,,,-.--.' <br /> � '� ' <br /> may be added for longer hauls. --"A; ;. `f' <br /> First preference will be given to hauling A-A Ceres self loader with a trailer making pickups from the ROW. <br /> vehicles best suited to local conditions. <br /> Knuckleboom self loaders are efficient, but in areas with narrow streets or limited overhead clearance, they <br /> are too large to be effective. In tight areas, pickup trucks with dumping trailers minimize traffic disruption <br /> and potential damage. Crew and overall debris collection production will be monitored on a daily basis. The <br /> Project Manager will alter crew composition and overall number of crews as necessary. Self Loaders may <br /> work singly or in conjunction with dump trucks. In accordance with FEMA guidelines, hand-loading will not <br /> be allowed or tolerated in any circumstance. Ceres owns seven Self Loaders (Knucklebooms) and has <br /> access to many more through our subcontractors. <br /> A minimum of one Hot Spot Crew will be assembled for each zone during this project. The crew(s) will <br /> commence operations within 24 hours of the notice to proceed. The typical crew will consist of: <br /> • One Knuckleboom or self-loader <br /> I • Three Laborers (one sawyer and two Flagmen) <br /> CEEiclE <br /> NVIRo N,AL Tab 8 Project Understanding and Technical Approach <br /> Section 1 Debris Management Operations Plan <br /> Page 8-5 <br />