My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CERES
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 18-04-02 Disaster Debris Management and Removal Services
>
Responses
>
CERES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 1:57:44 PM
Creation date
5/10/2018 3:33:08 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Disaster Debris Management
Bid No. (xx-xx-xx)
18-04-02
Project Type (Bid, RFP, RFQ)
RFP
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach <br /> RFP 18-04-02 Disaster Debris Management and Disposal Services <br /> 0 8.4 Ability to Mitigate Unforeseen Problems <br /> From experience, Ceres knows that establishing an accurate, efficient process for tracking truck tickets, <br /> truck certifications, and additional load and haul data is critical fora successful debris project. Ceres also <br /> knows that a project structure is important because it provides the foundation for success, and we know <br /> that a strategy is only as good as its execution. Ceres seeks to emphasize not only the form of managing <br /> the project, but we also pay special attention to the people that are performing the overall management of <br /> the project. . <br /> The table that follows addresses issues we have encountered and resolved during our many years in <br /> disaster debris management: <br /> Issue Explanation Resolution <br /> Inaccurate production rate The production rate at the beginning of a Proper use of mapping techniques and <br /> forecasting job can be misleading, because the more monitoring zones,allowing for the comparison of <br /> debris-laden areas are often addressed expected debris quantities and actual quantities. <br /> first. This causes forecasting errors Large discrepancies can be investigated. This <br /> because the required ratio of number of type of tracking allows for a more accurate job <br /> crews available to the quantity of completion prediction. <br /> outstanding work can be inaccurately <br /> predicted. <br /> Inadequate number of During a disaster response, Ceres has non-disaster business units whose <br /> trained disaster relief communications between field operations supervisors have been trained in disaster <br /> specialty supervisors and and corporate headquarters can be operations. Ceres has scheduled the non- <br /> managers on staff challenging and supervisory personnel disaster workload in a manner that allows the <br /> may be forced to make decisions without disaster business unit to commandeer personnel <br /> a lot of time or conferencing with from sister business units, and thus grow <br /> superiors. This makes having a cadre of instantly to a large operation.Additionally,Ceres <br /> 0 highly trained disaster response has an ongoing interviewing and hiring process <br /> supervisors and managers critical to and maintains a file of prospective employees <br /> operations. who can be called in when an event generates <br /> the need for additional staff. <br /> Inadequate material supplies A successful debris mission needs more Ship an ample supply immediately to the field <br /> than trucks, loaders and fuel.The and keep an additional supply at each main <br /> project also requires management and office location. Establish printing lead times and <br /> data tracking. In order to perform track quantities to ensure supply remains <br /> properly,a few items are critical,such constant. <br /> as truck placards on which to write the <br /> truck number and capacity, and truck <br /> certification forms with which to register <br /> and certify trucks.The shortage of these <br /> simple items can cause work to slow. <br /> Delayed repair of reported In the past, subcontractors were given a Ceres'subcontractors are now given 48 hours to <br /> damages grace period of two(2)weeks or more to settle damages. If the sub fails to repair damage, <br /> repair damages, leading to complaints Ceres will immediately make the repairs and <br /> from the community. back-charge the respective sub.The sub may be <br /> subject to temporary shutdown of their crews <br /> and/or termination of the subcontract. <br /> Excessive Subcontractor Excessive tiering requires multiple layers Our standard subcontract agreement has been <br /> Tiering of management and supervision, amended to include stronger prohibitions and <br /> increasing contracts costs and penalties for failure to obtain approval of lower <br /> tier subcontractors and implementation of tighter <br /> field controls and monitoring of Subcontractor <br /> hierarchical structure by Quality Control. <br /> (I) <br /> C E� o-�+�+ENTE` Tab 8 Project Understanding and Technical Approach <br /> Section 4 Ability to Mitigate Unforeseen Problems <br /> NVIRPage 8.4-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.