My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2037
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2013 10:59:36 AM
Creation date
3/22/2013 4:50:16 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2037
Date (mm/dd/yyyy)
03/21/2013
Description
Agmt w/RJ Behar & Co Engineer Srvs for Wall under Wm. Lehman Cswy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preview Page 1 of 2 <br /> 5,50NY 'sit City of Sunny Isles Beach <br /> 04 �-.rB <br /> A ; 18070 Collins Avenue <br /> l = Sunny Isles Beach, Florida 33160 <br /> %�"t �,.," (305)947-0606 City Hall <br /> c. sun ." (305)949-3113 Fax <br /> MEMORANDUM <br /> TO: The Honorable Mayor and City Commission <br /> FROM: Helen Gray, PE, City Engineer <br /> DATE: 3/21/2013 <br /> RE: . A Resolution Approving a Contract with RJ Behar & <br /> Company, Inc. for Design Services for a Wall Under the <br /> Lehman Causeway <br /> RECOMMENDATION: <br /> We recommend City Commission approve the contract. <br /> REASONS: <br /> The adopted FY13 budget includes a capital project for the construction of a solid <br /> wall under the Lehman Causeway that replaces the existing chain link fence <br /> separating the area under the Lehman Causeway from Ocean View and Ocean <br /> Reserve properties. In addition, in 2012, the City processed an RFQ for <br /> professional consulting services for companies to perform professional <br /> engineering services for various City projects; RJ Behar & Company, Inc. was <br /> one of four firms selected to perform work for the City. <br /> The project will be delivered via design-bid-build methodology; this contract <br /> provides for the preparation of plans and specifications needed for bids, including <br /> geotechnical analysis and utility exploration, cost estimates, processing for <br /> permits, and bid phase services. With a cost not to exceed $39,031.00 <br /> FUNDING SOURCE: <br /> Funding is available in Account Number 20-600-5663 <br /> http://sibagenda.sibfl.net/Agenda/Preview.aspx?ItemID=990&MeetinglD=0&Meeting Date... 3/14/2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.