Ill' [ HEWETT-KIER CONSTRUCTION, INC. GENERAL CONTRACTORS <br /> Master Project Schedule <br /> This schedule uses the same approach as the preliminary time model, identifying construction tasks, <br /> duration and precedence leading to a specific project's completion date.The schedule is a very useful <br /> tool with the following applications: <br /> • A completion date for the project is identified, and the schedule is backed into that <br /> date to ensure contract completion within the required time frame. <br /> • On-going schedule analysis allows our field and management personnel to consider <br /> recommendations to maintain and/or reduce the construction time line. <br /> • The Owner and project team is kept abreast of the scheduled completion date and any <br /> potential causes for delay. <br /> Cash Flow Schedule <br /> 41 The cash flow schedule is a derivative of the amount of work to be accomplished in each given <br /> month of the project as detailed in the Master Milestone Schedule. The cost of the work items is <br /> established during the estimating process and when applied to the durations in the schedule, the <br /> system establishes clear projections of billings each month. The software package is capable of <br /> automatically revising the calculations for monthly billing amounts when revisions are made to the <br /> Master Milestone Schedule. In this way cash flow projections remain accurate and up-to-date <br /> throughout the life of the project. <br /> Early Start Schedule <br /> The Master Project Schedule is sorted by Early Start. This schedule is utilized as the overall and <br /> individual activity schedule for the project. By planning activities around the Early Start date, <br /> Hewett-Kier Construction, Inc. is able to meet the overall schedule completion dates. It also allows <br /> use of any built-in float in the event activities don't commence on the Early Start date, thereby <br /> enabling the scheduled completion dates to be maintained. <br /> Responsibility Schedule <br /> The Master Project Schedule is sorted by responsibility so that the focus can be placed on each <br /> entity's scheduled activities and work requirements. Not only is the focus placed on the activities <br /> scheduled start, particular attention and emphasis is placed on the duration of each activity. <br /> ® Addressing and concentrating on durations of each activity ensures that the schedule will be met. It <br /> also enables contingencies to be developed in the event completion of an activity in the required time <br /> frame cannot be attained. <br />