My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craven Thompson & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 10:22:51 AM
Creation date
9/6/2018 10:19:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD FORM 330 (6/2004) <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />1 <br />21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED <br />City of Sunny Isles Beach <br />Central Island Drainage & Street Improvements <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2008 2009 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />City of Sunny Isles Mr. Rick Conner, P.E. <br />City Manager (305) 792-1928 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Hillers Electrical Engineering (HEE) provided design and construction services for replacement of the 3.4 <br />miles of roadway. Design included coordination with FP&L, roadway photometrics, new electrical service <br />points, new roadway lighting systems, and new conduit and conductor systems. <br />Project Highlights: <br />▪ Design of 78 new light poles and fixtures. <br />▪ Three new electrical service points were coordinated with FP&L. <br />▪ Locations of light poles were coordinated with the City to avoid undesirable locations. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br />(1) FIRM NAME <br />Hillers Electrical Engineering, <br />Inc. <br />(2) FIRM LOCATION (City and State) <br />23257 State Road 7, Suite 100 <br />Boca Raton, Florida 33428 <br />(3) Role <br />Subconsultant – Electrical Engineering <br />b. <br />(1) FIRM NAME <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />c. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />d. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />E | Page 42
The URL can be used to link to this page
Your browser does not support the video tag.