My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craven Thompson & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 10:22:51 AM
Creation date
9/6/2018 10:19:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD FORM 330 (6/2004) <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />3 <br />21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED <br />City of Aventura <br />Biscayne Boulevard (US1) Roadway Lighting <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2011 2016 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />City of Aventura Mr. Tony Tomei <br />Capital Projects Manager Phone: (305) 466-8923 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Hillers Electrical Engineering (HEE) provided design and construction services for replacement of the 2.5 <br />miles of Biscayne Blvd (US1) Roadway Lighting System in the City of Aventura. The existing lighting system <br />was comprised of cobra head fixtures on aluminum light poles that did not fit with the City’s Architectural <br />Scheme. Total Electrical Cost: $3,000,000.00. <br />Project Highlights: <br />▪ Lighting protect was divided into four separate phases and four plan volumes that were bid out <br />separately. <br />▪ New lighting system was installed prior to the demolition of the existing lighting system. Operation of <br />lighting circuits was maintained at all times during construction. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br />(1) FIRM NAME <br />Hillers Electrical Engineering, <br />Inc. <br />(2) FIRM LOCATION (City and State) <br />23257 State Road 7, Suite 100 <br />Boca Raton, Florida 33428 <br />(3) Role <br />Subconsultant – Electrical Engineering <br />b. <br />(1) FIRM NAME <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />c. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />d. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />E | Page 44
The URL can be used to link to this page
Your browser does not support the video tag.