Laserfiche WebLink
STANDARD FORM 330 (6/2004) <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />5 <br />21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED <br />Palm Beach International Airport <br />Construct Golfview Infrastructure, Phase I Project <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2013 2018 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Palm Beach County <br />Department of Airports <br />Ms. Cynthia Portnoy <br />Project Manager (561) 471-7411 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Hillers Electrical Engineering (HEE) provided design services for the Construct Golfview Infrastructure, Phase <br />1 Project at Palm Beach International Airport (PBIA). Project included relocation of existing FP&L <br />underground and overhead distribution systems, new FP&L distribution systems, relocation of existing AT&T, <br />Comcast and FP&L Fibernet communication systems, new lift station, and new road lighting systems. <br />Project Highlights: <br />▪ Relocate 4200ft of existing FP&L underground ductbank to facilitate the Golfview development. <br />▪ Relocate 800ft of existing FP&L, AT&T, Comcast and FP&L Fibernet overhead distribution systems to <br />facilitate new turn lane on Military Trail. <br />▪ Design 1.5 miles of new underground FP&L ductbanks to repower existing PBIA Airfield Lighting and <br />Navigational Systems and support future Hangar and Terminal developments. <br />▪ Design 2.5 miles of AT&T, Comcast, FP&L Fibernet and Airport Communication ductbank systems to <br />support future Hangar and Terminal developments. <br />▪ Design 3900ft of new LED roadway lighting systems per Palm Beach County and Illuminatin g Engineering <br />Society (IES). <br />▪ Design new duplex lift station per Palm Beach County Standards. <br />Total Estimated Electrical Cost: $2,160,000.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br />(1) FIRM NAME <br />Hillers Electrical Engineering, <br />Inc. <br />(2) FIRM LOCATION (City and State) <br />23257 State Road 7, Suite 100 <br />Boca Raton, Florida 33428 <br />(3) Role <br />Subconsultant – Electrical Engineering <br />b. <br />(1) FIRM NAME <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />c. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />d. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br /> <br />E | Page 46