Laserfiche WebLink
<br /> <br />CRAVEN THOMPSON & ASSOCIATES, INC. | 3563 NW 53rd STREET, FORT LAUDERDALE, FL 33309 | P 954.739.6400 <br />Joseph D. Handley, R.L.A. <br /> PROJECT ROLE | Lead Landscape Architect <br />NW 44th Street Passive Park and Oakland Park Boulevard Passive Park | Sunrise, Florida | Principal <br />Landscape Architect - Construction Cost: $8 Million. These 2 passive parks developed under the <br />Broward County Parks Bond Program include upland and wetland restoration, a splash pad, a nature - <br />themed playground, restroom and storage buildings, jogging paths, picnic shelters and canal boardwalk. <br />NE 38th Street (Andrews Avenue to NE 11th Avenue) | Oakland Park, Florida | Principal Landscape <br />Architect - Landscape, streetscape and irrigation design for the roadway reconstruction design of <br />approximately 0.90 miles of roadway improvements including neighborhood traffic calming. <br />Features to Enhance Neighborhood Integrity | Oakland Park, Florida | Principal Landscape Architect <br />Redesign of the entry features for the Royal Palm Isles and South Royal Palm Acres. <br />NE 34th Court Reconstruction (NE 2nd Avenue to Dixie Highway) | Oakland Park, Florida | Principal <br />Landscape Architect - Landscape, streetscape and irrigation design for the roadway reconstruction <br />design of approximately 0.60 miles. <br />NE 5th Avenue Reconstruction (Oakland Park Blvd to NE 38th Street) | Oakland Park, Florida | Principal <br />Landscape Architect - Landscape, streetscape and irrigation design for the roadway reconstruction <br />design of approximately 0.60 miles. <br />Miramar Parkway (I-75 to Flamingo Road) | Miramar, Florida | Principal Landscape Architect <br />Landscape, streetscape and irrigation design for the roadway reconstruction design of 2.5 miles. <br />Sheridan Street (NW 172nd Avenue to NW 184th Avenue) | Pembroke Pines, Florida | Principal <br />Landscape Architect - Landscape, streetscape and irrigation design for the roadway reconstruction <br />design of approximately 1 mile. <br />Pembroke Road (SW 145th Avenue to Silver Shores) | Miramar & Pembroke Pines, Florida | Principal <br />Landscape Architect - Landscape, streetscape and irrigation design for the roadway reconstruction <br />design of approximately 1.5 miles. <br />Sunrise Boulevard (Hiatus Road to Pine Island Road) | Sunrise, Florida | Principal Landscape Architect <br />Landscape, streetscape and irrigation design for the roadway reconstruction design of approximately 1.8 <br />miles. <br />Broward Boulevard (Pine Island Road to University Drive) | Plantation, Florida | Principal Landscape <br />Architect - Landscape, streetscape and irrigation design for the roadway reconstruction design of <br />approximately 0.80 miles. <br />City of Dania Beach Public Services Administration Building | Dania Beach, Florida | Principal <br />Landscape Architect - The Public Services building was a complicated project due to the expansive area <br />of parking for the utility vehicles. The perimeter had to be heavily landscaped to compensate for the <br />paving area and to help screen the facility from the neighboring residential properties. The landscape <br />materials utilized were 100% native to provide a positive example to the community on how the City has <br />taken an effort to design with the environment in mind. <br /> <br />F | Page 22