<br />12. NAME
<br />Larry M. Smith, P. E.
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />Electrical Engineer
<br />14. YEARS EXPERIENCE
<br />TOTAL b. WITH CURRENT FIRM
<br />30 1 17
<br />15. FIRM NAME AND LOCATION (Cityand State)
<br />Smith Engineering Consultants, Inc, 2161 Palm Beach Lakes Blvd., Suite 312, West Palm Beach, FL 33409
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Science in Electrical Engineering
<br />17. CURRENT PROFESSIONAL
<br />Florida/Electrical Engineering
<br />TE AND DISCIPLINE)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Post -graduate studies at FAU in telecommunications, Tau Beta Pi (Engineering Honor Society), IEEE, Florida Engineering Society (Past
<br />President of the Palm Beach Chapter), Florida Building Code electrical technical advisory committee, FES state energy committee.
<br />a. (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE I [X] Check if project performed with current firm
<br />Electrical design for the gate control structure and trash rakes. This included the electrical service and distribution, controls, lighting,
<br />instrumentation, and telemetry systems. The telemetry system was designed using the District's standard RTU design.
<br />(1) TITLE • LOCATION (City and State) (2) YEAR COMPLETED
<br />SFWMD P.S. 319 PROFESSIONAL SERVICES CONSTRUCTION
<br />Loxahatchee, Florida 2005 2005
<br />b. (3) BRIEF DESCRIPTION (eriefscope, size, cost, etc.)AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Construction administration for the electrical systems of this pump station designed by the Army Corps of Engineers. We observed the electrical
<br />installations and prepared the contract record drawings for review by the Corps. Corrections were made to the electrical design drawings in
<br />accordance with the actual construction observed by us and as reported by the contractor.
<br />C. (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE I [X] Check if project performed with current firm
<br />Electrical design for a new stormwater pump station. This pump station consisted of six (6) electric motor operated pumps with both upstream
<br />and downstream water level monitoring. A backup diesel generator was designed to provide power for full pumping capacity. Reduced -voltage
<br />motor starters were designed to reduce the starting inrush current for the large electric motors. Electrical design included motor operated gates
<br />for control structures, electrical service and distribution, lighting, controls, instrumentation, and telemetry systems.
<br />d. (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE I [X] Check if project performed with current firm
<br />Electrical design including power, controls, instrumentation and telemetry for the conversion of the existing wetwell pump station to an in-line
<br />booster station. Variable frequency drives (VFD's) were used to match the varying wastewater flow into and out of the pump station. An
<br />upgraded telemetry system was designed to replace the existing, aging system, and to provide control and status reporting to the existing central
<br />station.
<br />e (3) BRIEF DESCRIPTION (Briefsoope, size, cost, etc.) AND SPECIFIC ROLE I [X] Check if project performed with current firm
<br />Electrical design including power, controls, instrumentation and telemetry for the rehabilitation of an existing reclaimed water pump station.
<br />Five (5) new pumps were provided with variable frequency drives (VFD's) to provide water to the local community, including golf course
<br />irrigation. A hydropneumatic tank with an air compressor system was installed to help maintain water pressure.