Laserfiche WebLink
-SEC <br />12. NAME <br />P.K. Patel, P.E. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. <br />Electrical Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />40 1 1 <br />15. FIRM NAME AND LOCATION (city and State) <br />Smith Engineering Consultants, Inc, 2161 Palm Beach Lakes Blvd., Suite 312, West Palm Beach, FL 33409 <br />16. EDUCATION (DEGREEAND SPECIALIZATION) <br />Bachelor of Science in Electrical Engineering <br />17. CURRENT PROFESSIONAL REGISTRA <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Institute of Electrical and Electronics Engineers (IEEE) <br />FloridatElectrical Engineering <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE I [X] Check if project performed with current firm <br />Electrical design, including power, controls, instrumentation and telemetry for the installation of new pump control panels and remote telemetry <br />units (RTU's), throughout Palm Beach County WUD's service area. The scope of services includes over 80 lift stations with a variety of the <br />following (1) add new RTU, radio and antenna with ultrasonic level transducer (2) replace control panel (3) add generator receptacle. The <br />existing relay logic and level control systems will be replaced with PLC's using level control and high level float. <br />b. (3) BRIEF DESCRIPTION (Briefscope, size, cost etc.) AND SPECIFIC ROLE I [X] Check if project performed with current firm <br />Prepare an electrical system model and complete short-circuit and arc flash analyses in accordance with IEEE Std. 1584 and NFPA 70E for <br />the electrical system equipment throughout the building required to be labeled by the standards. This equipment includes switchboards, <br />panelboards, control panels, disconnect switches, etc. Prepare arc flash warning labels for individual electrical equipment to include: <br />calculated incident energy, hazard risk category, arc flash boundary, and personal protective equipment (PPE) required. <br />C. I (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE <br />d. I (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE <br />e. I (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE <br />[ ] Check if project performed with current firm <br />[ ] Check if project performed with current firm <br />[ ] Check if project performed with current firm <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />131 <br />