Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />ZU. LAAWIrLr rKUJLUI r\cr <br />NUMBER <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER I b. POINT OF CONTACT NAMEI c. POINT OF CONTACT TELEPHONE NUMBER <br />Village of Royal Palm Beach Ray Liggins, P.E. (561) 790-5165 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />A recent expansion to the existing wastewater treatment plant included the addition of a new dewatering building <br />(including belt filter press and truck loading area), odor control system, site lift station, sodium hypochlorite structure, and <br />effluent pump station modifications. New site lighting was installed throughout the project. A new 1,200A, 480V <br />electrical service was designed to feed the entire plant including both existing and new electrical loads. Complex control, <br />instrumentation, and SCADA systems were provided and integrated into a new plant control system. <br />Smith Engineering Consultants designed all of the electrical systems, including power, lighting, controls, instrumentation, <br />and SCADA for an even more recent plant expansion. This expansion included the addition of a new pre-treatment <br />(headworks) structure, equalization basin, aerobic digester, two (2) new clarifiers, and effluent pump station <br />modifications. This expansion was never constructed because of Palm Beach County's acquisition of the Royal Palm <br />Beach utilities. <br />Total Project Cost = $2,300,000 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (6/2004) PAGE 3.7 <br />140 <br />