Laserfiche WebLink
H. ADDITIONAL INFORMAITON <br />30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED, <br />Smith Engineering Consultants, Inc. is a multi -discipline engineering firm with an in-depth knowledge of energy, <br />water, telecommunications, and architectural projects. At SEC, we approach our business just as you do, focusing on <br />out, customers and the various environments in which they operate. <br />SEC places a strong emphasis on creating productive working relationships with clients. Because we believe that <br />teamwork is the key to success, our professionals are committed to responsive service, attention to detail, and effective <br />communication and cooperation. <br />Our staff has built a deserved reputation for completing assignments in a cost-effective and timely manner. We've <br />accomplished this through innovative thinking, careful planning, and professionals who believe in quality and hard <br />work. <br />As Florida continues to experience tremendous growth, capital improvement projects will remain in the forefront of <br />municipal infrastructure improvement efforts. The staff at Smith Engineering Consultants has played an important role <br />in the design, construction, and renovation of facilities throughout the state. Our knowledge of facilities and agencies <br />in Palm Beach, Martin, and St. Lucie Counties is particularly notable, due to our more than 30 years of experience here <br />in south Florida. <br />Public facilities require complex electrical and mechanical systems, including HVAC, plumbing, power, lighting, <br />controls, instrumentation, and telemetry. You can turn to SEC for expertise in the design of these elements. <br />Cost-effective design is the key to success for today's municipal infrastructure projects. Understanding that funding <br />usually comes from a county or city's own tax base, our staff approach every design from a "Total Project" perspective. <br />We will provide the most cost-effective and efficient design for the long term, always looking hard at the client's <br />operation and maintenance costs. <br />I. AUTHORIZED REPRESENTATIVE <br />The foregoing is a statement of facts. <br />31. SIGNATURE <br />33. NAME AND TITLE \,� <br />Larry M. Smith, P.E./President <br />32. DATE <br />08-27-18 <br />STANDARD FORM 330 (6/2004) PAGE 5 <br />145 <br />