Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each kev person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />Marcus Unterweger, P.E., S.I., LEED AP Principal/Project Manager 19 8 <br />15, FIRM NAME AND LOCATION (City and State) <br />MUEngineers, Inc. Oakland Park, Florida <br />16. EDUCATION (DEGREEAND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE ANDDISCIPLINE) <br />Masters of Engineering: Dipl. Ing. (Univ.) Technical University Registered Professional Engineer: Florida: PE 63860, <br />of Munich, Germany 1999 West Virginia: PE 20193 <br />Special Inspector/Threshold Buildings: Florida: 7027309 <br />Master of Business: MBA Business School of Edinburgh, <br />Britain, 2004 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Society of Civil Engineers (ASCE) American Institute of Steel Construction (AISC) <br />American Concrete Institute (ACI) Post Tension Institute (PTI) <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 3/2013) PAGE 2 <br />148 <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Seawall Assessment and Restoration <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Aventura Florida <br />2018 <br />I Ongoing <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />a' <br />Our office performed visual observations of the seawalls from both the land and <br />the water equaling a total of 5.2 miles of canal. Structural assessment of the <br />current conditions of the existing piles, seawall panels and seawall caps were <br />nht;;inpri. analyzed and a written reoort of our findings was preoared <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Norwood-Oeffler Water Treatment Plant <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if applicable) <br />Miami Gardens Florida <br />2012 <br />2014 <br />I <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />b <br />MUEngineers, Inc. was involved in the upgrades and modifications made at the <br />North Miami Beach Norwood-Oeffler Water treatment plant. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />North Dixie Highway Streetscaping <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Wilton Manors Florida <br />2013 <br />2014 <br />I <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />C. <br />Our role as structural engineers was the design of standard light pole foundations <br />and standard entry sign foundations for improvements along North Dixie Highway <br />in Wilton Manors. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Broward County Light Poles Installation <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Various Broward County,Florida <br />Ongoing <br />Ongoing <br />I <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />d <br />MUEngineers was a member of a team for this RFQ with the Broward County <br />Highway Construction & Engineering Division. Our role on this project is to assess <br />the structural integrity of 12 existing light poles and their base connections. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Fort Lauderdale International Airport, Terminal 2 <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Hollywood, Florida <br />2012 <br />2014 <br />I <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />e. <br />Structural design of a new free-standing steel framed canopy adjacent to the <br />existing Terminal 2 building to protect the new baggage handling system, <br />comprised of new suspended mechanical equipment. <br />STANDARD FORM 330 (REV. 3/2013) PAGE 2 <br />148 <br />