Laserfiche WebLink
F. EXAMPLE PKUJEG 15 VIIHIGH bt:b I ILLUS I KA 1 t PKUPUStU I tAM'S 20. EXAMPLE PROJECT KEY <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, if not <br />specified. 2 <br />(1) TITLE AND LOCATION (City and State) <br />Norwood Oeffler Water Treatment Plant <br />Miami Gardens. Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2012 2014 <br />f����tillTxi��[i]�i�t�C�:i�9(�(�il:�►�I:ii[�7�1 <br />a. PROJECT OWNER b. POINT OF CONTACT NAME I <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />City of Miami Gardens <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />MUEngineers, Inc. was involved in the upgrades and modifications made at the North Miami <br />Beach Norwood-Oeffler Water treatment plant. Our responsibilities included: structural design of <br />a new slab on grade and new parapets and vertical parapet extensions, in the electrical room; <br />structural design of infill for existing wall openings and a new roof above the electrical room. We <br />also provided wind pressures for new windows, doors and roofing. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (REV. 3/2013) PAGE 3 <br />151 <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />a. <br />MUEngineers, Inc. <br />Oakland Park, Florida <br />Structural Engineers <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />C. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />d. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />e. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />f. <br />STANDARD FORM 330 (REV. 3/2013) PAGE 3 <br />151 <br />